Site work for a water / sewer project in San Luis Obispo, California. Completed plans call for site work for a water / sewer project.

Q & A deadline: Nov 30, 2023 2:00:00 PM EST Wash Water Tank No. 1 Rehabilitation, Specification No. 2000034-03 Any bid received after the time and date specified will not be considered and will be returned to the bidder unopened. Bids received by Fax or Email will not be considered. By submission of bid you agree to comply with all instruction and requirements in this notice and the contract documents. All bids must be submitted on the Bid Item List form(s) provided and submitted with all other Bid Forms included in these Special Provisions. Each bid must be accompanied by either a: 1. certified check 2. cashier's check 3. bidder's bond made payable to the City of San Luis Obispo for an amount equal to ten percent of the bid amount as a guaranty. Guaranty will be forfeited to the City San Luis Obispo if the bidder, to whom the contract is awarded, fails to enter into the contract. The City of San Luis Obispo reserves the right to accept or reject any or all bids or waive any informality in a bid. All bids are to be compared based on the City Engineer's estimate of the quantities of work to be done, as shown on the Bid Item List. Bids will only be accepted from bidders that are licensed in compliance with the provisions of Chapter 9, Division III of Business and Professions Code. The award of the contract, if awarded, will be to the lowest responsive bid submitted by a responsible contractor whose bid complies with the requirements prescribed. If the contract is awarded, the contract will be awarded within 60 calendar days after the opening of the bids. Failure to raise defects in the notice to bidders or bid forms prior to bid opening constitute a waiver of those defects. BID DOCUMENTS A copy of the plans and special provisions may be downloaded, free of charge, from the City's website at: www.slocity.org/government/department-directory/public-works/public-works-bidsproposals Standard Specifications and Engineering Standards referenced in the Special Provisions may be downloaded, free of charge, from the City's website at: www.slocity.org/government/department-directory/public-works/documentsonline/construction-documents You are responsible to obtain all issued addenda prior to bid opening. Addenda will be available to download at the City's website listed above or at the office of the City Engineer. Contact the project manager, Noah Maidrand at (805) 783-7854 or the Public Works Department at (805) 781-7200 prior to bid opening to verify the number of addenda issued. You are responsible to verify your contact information is correct on the plan holders list located on the City's website at: www.slocity.org/government/department-directory/public-works/public-works-bidsproposals. PROJECT INFORMATION In general, the project includes removal and disposal of heavy-metal bearing exterior coatings from an existing approximately 190,000 gallon steel tank. Project also includes recoating interior and exterior surfaces, removal of existing steel roof and rafters, furnishing and installing a free-spanning aluminum roof, and construction of a 3-foot high shell wall extension to the top course of the existing tank shell. The project estimated construction cost is $540,000. Contract time is established as 80 working days . See Section 8 Prosecution and Progress for start date. The time required for material procurement is not included in the contract time. The time required to fill the tank and obtain Volatile Organic Compound (VOC) and bacteriological sampling results is excluded from the contract duration. The fixed liquidated damages amount is established at $1,000 per day for failure to complete the work within the contract time. In compliance with section 1773 of the Labor Code, the State of California Department of Industrial Relations has established prevailing hourly wage rates for each type of workman. Current wage rates may be obtained from the Division of Labor. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. There will be a mandatory walkthrough on November 9th, 2023, at 11am. Prime contractors wishing to submit a bid proposal are required to attend and sign in at the meeting. Bidders should meet at the San Luis Obispo Water Treatment Plant at 1900 Stenner Creek Rd. QUALIFICATIONS You must possess a valid Class A or C-33 Contractor's License at the time of the bid opening. You and any subcontractors required to pay prevailing wage must be registered with the Department of Industrial Relations pursuant to Section 1725.5 of the Labor Code. You must have experience constructing projects similar to the work specified for this project. Provide three similar reference projects completed as the prime contractor or by your qualified subcontractor. All referenced projects must have been completed within the last five years from this project's bid opening date. All referenced projects must have been completed under contract with a city, county, state or federal government agency. Two referenced projects must include surface preparation and coating of steel water tanks of similar or greater size including the mitigation of heavy metalbearing coatings using full containment systems. One referenced project must include structural steel tank welding. Failure to provide reference projects as specified in this section and as required on the qualification form is cause to reject a bid as being non-responsive. The City reserves the right to reject any bid based on non-responsiveness if a bidder fails to provide a bid that complies with all bidding instructions. The City reserves the right to reject a responsive bid based on the non-responsibility of the bidder if the Director of Public Works or Designee finds, after providing notice and a hearing to the bidder, that the bidder lacks the 1. knowledge 2. experience, 3. or is otherwise not responsible as defined in Section 3.24 of the San Luis Obispo Municipal Code to complete the project in the best interest of the City. Rejected bidders may appeal this determination. Appeal must comply with the requirements in this Notice to Bidders. It is the City of San Luis Obispo's intent to award the contract to the lowest responsive bid submitted by a responsible bidder. If in the bidder's opinion the contract has been or may be improperly awarded, the bidder may protest the contract award. Protests must be filed no later than five working days after either: 1. bid opening date 2. notification of rejected bid. Protest must be in writing and received by the project manager located at: 919 Palm Street San Luis Obispo, CA 93401. Valid protests must contain the following information: 1. the reasons for the protest 2. any supporting documentation 3. the ruling expected by the City to remedy the protest. Any protest not containing all required information will be deemed invalid and rejected. The City will consider additional documentation or other supporting information regarding the protest if submitted in compliance to the specified time limits. Anything submitted after the specified time limit will be rejected and not be considered. The Director of Public Works or Designee may request additional information to be submitted within three days of the request, unless otherwise specified, and will notify the protester of ruling within ten days of determination. If the protester is not satisfied with ruling, the protester may appeal the ruling to the City Council in compliance with Chapter 1.20 of the City of San Luis Obispo Municipal Code. Pursuant to the Public Records Act (Government Code, 6250, et seq.), the City will make public records available upon request. AWARD The lowest bidder will be determined using the BID TOTAL. As a condition to executing a contract with the City, two bonds each equal to one hundred percent of the total contract price are required in compliance with Section 3-1.05 of the Standard Specifications. You may substitute securities for moneys withheld under the contract in compliance with the provisions of the Public Contract Code, Section 10263

Post-Bid

Water / Sewer

$540,000.00

Public - City

Site Work

14

15

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
222
All Active Projects
99
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

June 17, 2024

img_map_placeholder

1900 Stenner Creek Rd, San Luis Obispo, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.