BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Highland, California. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

As of December 13,2023, project was awarded to Econolite Systems, Inc, awarded amount is $109,697.58. Reference Number 0000333893 Upgrade existing pedestrian signal heads to LED countdown pedestrian signal heads, replacing existing and/or installing new ADA compliant pedestrian push buttons, installations of new pedestrian push button posts, 2" PVC conduit, and cabling as necessary at the intersections listed in Table 1 and as shown on the plans. This project also includes the installation of signs in existing standards as indicated on Table 1. Any questions regarding the plans and specifications must be directed in writing to: Carlos Zamano, Public Works Director/ City Engineer 27215 Base Line Highland, CA 92346 Email: czamano citvofhighland. org. All proposals or bids shall be accompanied by cash or a check payable to the City of Highland, certified by a responsible bank, for an amount which shall not be less than ten percent ( 10%) of the grand total bid or by a bond for the amount over and above all statutory exemptions, or by a bond of an accredited surety company. The successful bidder will be required to furnish a and materials bond and a faithful performance bond in the amount equal to one hundred percent ( 100%) of the contract price, such bonds to be secured by a surety company or surety companies satisfactory to the City Council of the City of Highland. General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Insurance Required - Prevailing Wage Required *The City of Highland reserves the right to reject all bids and re- advertise if the City determines that acceptance of the lowest responsible bid will not be in the best interests of the City of Highland.

Award

Sidewalks / Parking Lot

$109,698.00

Public - City

Site Work

7

5

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
95
Bidding Soon
2,118
All Active Projects
956
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

December 18, 2023

img_map_placeholder

Multiple Locations, Highland, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.