Site work for a water / sewer project in Tupelo, Mississippi. Completed plans call for site work for a water / sewer project.

As of March 21, 2024 project was awarded to Reinhold Electric, Inc., awarded amount is $5,455,103.70. https://www.djournal.com/news/local/east-jackson-street-underground-utility-expansion-expected-to-begin-soon/article_421da2fc-d0fe-11ee-a7ff-93cee97d973d.html TUPELO -- Tupelo city officials will move forward with burying utility lines along another section of Jackson Street in an effort to beautify and increase reliability along the busy thoroughfare. The Tupelo City Council voted unanimously among present members to accept a $5.4 million contract with Missouri-based contractor Reinhold Construction for underground utility work on East Jackson Street from Madison to Front streets in anticipation of its widening. ________________________________________________________________________________________________________________________________________________________________ https://www.djournal.com/news/local/major-thoroughfare-moves-ahead-with-multi-million-dollar-road-projects/article_39dfedc6-ca90-11ee-ba5d-37393babfc14.html TUPELO -- Following a healthy discussion on obligation and costs, the citizen committee focused on improving Tupelo's streets has agreed to take the plunge on a multi-million dollar project to move utilities underground while also committing to its next project. On Monday, members of the Major Thoroughfare Committee voted unanimously to approve a $5.4 million contract with Missouri-based contractor Reinhold Construction for underground utility work on East Jackson Street from Madison to Front streets in anticipation of its widening. ____________________________________________________________________________________________________________________________________________________________________ As of February 15,2024, this project has not yet been awarded. The project is expected to be awarded on February 20, 2024. Overhead to Underground Utility Relocations and/or Street Lighting Along Jackson Street Between N Madison and N Front Streets The Project generally consists of the following: Base Bid: Furnish labor, material, and equipment to convert approximately 1/2 mile overhead 15kV 3 Phase distribution line to underground. Install new concrete poles and primary risers to terminate back to existing 15kV overhead 3 Phase. Direction bore and trench new conduit, install flush mount pull boxes/handholes, and padmount medium voltage Vista switchgear. Install conduit duct system to accommodate primary underground, secondary, underground, fiber, AT&T, Comcast, CSpire, Select Connect, and Windstream. AT&T, Comcast, C- Spire, Select Connect, and Windstream work will only consist of the installation of the conduit system. Optional Adder: Furnish labor and material for the complete installation of new street lighting. Bids will be accepted only under the name of the Bidder to whom contract documents have been issued, and whose name appears on the official list of Plan holders maintained by the City of Tupelo. Each bidder must deposit with this bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within 45 days after the actual date of the opening thereof. Simultaneously with his delivery of the executed contract, the Contractor shall furnish surety bonds subject to the conditions provided in the Information for Bidders. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. Each Bidder is responsible for inspecting the site and for reading and being thoroughly familiar with the Contract Documents. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation in respect to this Bid. A conditional or qualified Bid will not be accepted. Award will be made to the lowest responsible, responsive Bidder. The Owner reserves the right to waive any informality or to reject any or all Bids. Question Deadline 01/11/2024 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer.

Award

Water / Sewer

$5,455,104.00

Public - City

Site Work

45

10

11

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
25
Bidding Soon
331
All Active Projects
140
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2024

February 23, 2024

img_map_placeholder

W Jackson St, Tupelo, MS

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.