BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Chicago, Illinois. Working plans call for the renovation of a municipal facility.

As of January 1, 2024, no bids received. No definite date for the rebid. The Contract is Divided, for Purposes of Bidding, Into Three Items. Bidders Must Submit Bids for All Items or the Bid Will Be Rejected as Non-responsive. The District Intends to Issue One (1) Contract to One (1) Bidder for All the Work to Be Performed. the Estimated Cost of This Contract is Not to Exceed $154,400.00. There is No Bid Deposit Required for This Contract. a Contractor's Bond Will Be Required. Please Refer to the Agreement Section and the Contractor's Bond Section for Additional Information About This Requirement. Funding for All Contract Items is Subject to the Board of Commissioners' Approval of the District's Budget for All Years Under This Contract. Further, the District Assumes No Liability or Responsibility for the Failure or Inability of Any Bidder to Successfully Download Any and All Contract Documents, Including but Not Limited to Specifications, Proposal Forms and/or Plans, as a Result of Any Type of Technological Computer and/or Software System Failure or Breakdown That Restricts, Prohibits or Prevents Successful Downloading of Any and All District Contract Documents by the Bidder, Whether Caused by the District or Other Parties, Directly or Indirectly. The District Will Only Respond to Questions Received Online Up to One Week Prior to the Bid Opening Date of the Bidding Documents. The District Will Not Respond to Questions Received After This Date. The District Does Not Guarantee the Timeliness of Responses Provided Online, Nor Does the District Guarantee That Such Responses Will Be Provided in Adequate Time to Affect the Submission of Bids. The District Shall Provide Responses Online Only if the Responses Do Not Interpret or Otherwise Change the Bidding Documents. The District's Responses Online Are Not Official Responses and, Therefore, Are Not Binding to the Bidding Documents. Any Official Interpretation or Change to the Bidding Documents Will Be Made Only by Addenda Duly Issued to All Plan Holders on Record by the Director of Procurement and Materials Management. Failure on the Part of the Prospective Bidder to Receive a Written Interpretation Prior to the Time of the Opening of Bids Will Not Be Grounds for Withdrawal of Proposal. Prior to Award of the Contract, the Lowest Responsible Bidder Must Demonstrate Compliance With the District's Multi-project Labor Agreement by Submitting to the Director of Procurement and Materials Management a Signed Certificate of Compliance With the Multi-project Labor Agreement. The Agreement and Certificate of Compliance Are Contained in the Contract Documents. Bidders on Contracts in Excess of Ten Thousand Dollars ($10,000.00) Will Be Required to Comply With the President's Executive Order No. 11246 as Amended to Date, Regarding Nondiscrimation in Employment. The Requirements for Bidders and Contractors Under This Order Are Explained in Appendix C of the Contract Documents. The Provisions of Appendix C Also Apply to Each Subcontractor on the Contract in Excess of Ten Thousand Dollars ($10,000.00). Each Bidder Must Submit With Their Proposals a Signed and Completed Mbe/wbe Utilization Plan Which Lists Each Business Intended to Be Used as an Mbe and Wbe on Pages Up-2 and Up-3 and Supplemental Pages, as Necessary. The Bidder Must Sign the Signature Section Page on Up-4. Failure to Submit a Signed Mbe/wbe Utilization Plan Will Result in a Bid Being Deemed Nonresponsive and the Bid Will Be Rejected. Also, if a Waiver is Sought, the Bidder is Required to Sign Pages Up-4 and Up-5, the Waiver Request Form; Failure to Do So Will Be Viewed as Nonresponsive and the Bid Will Be Rejected. Each Bidder Must Submit With Their Bid Package an Original or Facsimile Copy of the Mbe/wbe Subcontractor's Letter of Intent, Page Up-6 for Each Subcontractor Listed on Their Mbe/wbe Utilization Plan. The Submitted Mbe/wbe Subcontractor's Letter of Intent Must Be Completed and Signed by the Subcontractor and Accompanied With a Copy of the Subcontractor's Current Letter of Certification From a State, Local Government or Agency or Documentation Demonstrating That the Subcontractor is a Mbe or Wbe Within the Meaning of the Affirmative Action Ordinance, Revised Appendix D. Failure to Submit the Mbe/wbe Utilization Plan Signed by the Bidder at the Time of the Bid Opening and the Mbe/wbe Subcontractor's Letter of Intent Signed by Each Mbe and Wbe Will Be Viewed as Non-responsive and the Bid Will Be Rejected. if the Bidder Exceeds the Allowable Supplier Utilization Amount Which is Stated in the Bid Documents, the Bid Will Be Viewed as Non-responsive. Therefore, the Bidder May Not Exceed the Use of a Mbe or Wbe Supplier for More Than 50% of Each Respective Mbe or Wbe, Goal, Unless the Director of Procurement and Materials Management Has Authorized a Supplier's Exception Notated on Page Au-1. (1604544, 1604545, 1604546) Any questions regarding the downloading of the Contract Document should be directed to the following email: contractdesk@mwrd.org or call 312-751-6643 The contact person for this Contract is Ms. Diana Robles. This contact person will provide online responses to online inquiries.

Final Planning

Municipal

$154,400.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
220
Bidding Soon
3,110
All Active Projects
1,320
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 23, 2024

August 22, 2024

img_map_placeholder

Multiple Locations, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.