Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Springfield, Missouri. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.
The Environemental Services department desires to construct a new campus on a greenfield site in the southwest area of the city near the SW Treatment Facility. This will allow the department to consolidate its operations at this campus facility and, in turn, release space in existing facilities for use by other city departments. The campus project will support and facilitate maintenance activities as well as office space for professional, technical and administration staff. The maintenance facility will consist of garages capable of housing approximately 70 vehicles which may be Sewer CCTV Inspection vans, Sewer Cleaning/Flusher rigs, Dump Trucks and various other smaller work vehicles. As necessary for efficient use of the site and site grading, the garage space may be configured in one or in multiple garage buildings. A portion of the garage space will need to be climate controlled to minimize heat (for CCTV rigs which contain significant computer/IT based equipment) and a portion will need to minimize cold (for cleaning/flusher trucks that store water which cannot be allowed to freeze). The maintenance facility may also need to have office space adequate for administration and technical staff who support the maintenance work and the analysis of field-collected asset data. Locker facilities will be needed for all members of work crews and workstations are required for field crew leaders to organize work activities at the beginning and end of each workday. The maintenance facility is to be secured with appropriate fencing to protect the buildings, equipment, and materials stored on the site. Site access is to be controlled through gate location(s) operated by City issued key cards. The Consultant should be able to demonstrate successful past performance in design of similar municipal facilities. The office portion of the facility will need to be of sufficient size to provide a suitable working and collaborative environment for approximately 140 staff members. The building may be single or multi-story. The office is envisioned tocontain a public facing education area to be used in support of education to a variety of groups 2022-028-ESSC - CITY OF SPRINGFIELD 2from elementary school, through universities, and adult programs. The office is to provide a flexible environment which can support collaboration while providing multiple options for workspaces that provide individual work environments conducive to the needs of the occupants. The Consultant should be able to demonstrate successful past performance in design of similar office environments. The project will be constructed on city-owned properties lying both north and south of Rountree Road, west of Farm Road 123. This location is immediately south of the city’s SW Treatment Facility and is near the interchange of U.S. 60 and Route FF. The specific tracts lie north and south of geo coordinates 37.146221,-93.370769. Design phase expected to be complete in January 2025. Construction expected to begin May 2025 with completion in November 2026.
Conceptual
Municipal
$30,000,000.00
Public - City
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 30, 2025
Rountree Rd, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Nov 13 2023
Springfield, MO
Bid Date: Nov 29 2023
Springfield, MO
Bid Date: Nov 21 2023
Springfield, MO
Bid Date: Nov 28 2023
Springfield, MO
Bid Date: Nov 16 2023
Springfield, MO
Bid Date: Nov 07 2023
Springfield, MO
Bid Date: Nov 16 2023
Springfield, MO
Bid Date: Nov 09 2023
Springfield, MO
Bid Date: Dec 05 2023
Springfield, MO
Bid Date: Nov 03 2023
Springfield, MO
Bid Date: Oct 26 2023
Springfield, MO
Bid Date: Oct 26 2023
Springfield, MO
Bid Date: Oct 25 2023
Springfield, MO
Bid Date: Oct 26 2023
Springfield, MO
Bid Date: Nov 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.