Demolition, site work, renovation and addition to an educational facility in Nixa, Missouri. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The project consist of construction of a New Classroom addition at the High Pointe Elementary campus, which includes an Safe room which will comply with ICC 500 requirements for a high wind event safe room. The work consists of, but is not limited to, sitework, new Construction of CMU and metal stud walls, structural steel framing, concrete, TPO roof systems, FEMA 361 rated windows and doors, electrical, mechanical, plumbing, and interior finish work. The project is located at 900 N Cheyenne Rd Nixa, MO 65714 in Christian county, Missouri. Missouri Prevailing wage rates will apply to the work. Questions regarding the project should be directed to Sapp Design Associates Architects, 3750 S. Fremont Ave., Springfield, Missouri 65804, 417-877-9600. Each Bid proposal shall be accompanied by a 5% bid security in the form of a Cashier's check, a certified check, or a bid bond executed by the bidder and surety company. Surety/Bonding company must be acceptable to the owner and be authorized to transact business in the State of Missouri. The Owner reserves the right to accept or reject any or all bids and may waive any or all informalities in the bid process. The Owner's decision regarding the approval/denial of bids are based on varies factors such as, but not limited to, quality, time constraints, and service. All decisions will be in the best interest of the district and shall be final. No bids may be withdrawn for a period of 30 days subsequent to the specified time for receipt of bids. Bidder and any Subcontractors must follow and enforce all requirements of Missouri's Prevailing wage laws. The Gainesville School District is an equal opportunity Employer and encourages bids from qualified small, minority-owned, Women-owned business enterprises. Due to the nature and scope of this work, each bidder shall fully informed him/herself prior to bidding as to existing conditions and limitations under which the work is to be performed. No allowance will be made to a bidder because of lack of such examination or knowledge.

Award

Educational

$2,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

84

28

40

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Interior Painting, High-Performance Coatings
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Furnishing Accessories, Clocks, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Furnaces, Central HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Uninterruptible Power Supply, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Irrigation, Planting, Plants, Ground Covers, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
28
Bidding Soon
358
All Active Projects
129
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 4, 2023

img_map_placeholder

900 N Cheyenne Rd, Nixa, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.