BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Mount Vernon, Missouri. Completed plans call for site work for a water / sewer project.

Chesapeake Fish Hatchery Raceway Valve Replacement The vendor shall furnish and deliver to replace the existing four-inch (4, diameter) resilient seated butterfly valves in kind for the total quantity of twenty-four (24). The Owner will procure and install these butterfly valves. This contract is under a single material only purchase contract. Estimate: $90,000 - $110,000 Site Directions: 21186 Highway 174, Mount Vernon, MO 65712 From Mt. Vernon, take Highway 174 east 8 miles to the area. POINT OF CONTACT A. Bidding Questions: Dan Mahurin, Contract Specialist Phone No. 573-522-4115 Ext. 3765, or Fax 573/522-2324 E-mail: dan.mahurin@mdc.mo.gov B. Design Questions: Chitra Poudel, Project Manager Phone No. 573-522-4115 Ext. 3764 or Fax 573-522-2324 E-mail: chitra.poudel@mdc.mo.gov C. Construction Project Manager Matt Boessen, Construction Project Manager : Phone No. 573-522-4115 Ext. 3596 or Fax 573-522-2324 Email: matt.boessen@mdc.mo.gov Unit price is an amount incorporated into the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased Unit Price No. 1: General: The total sum of all unit prices shall equal the cost of fabrication and delivery to the project site as specified herein. The cost of any specific item or task not listed in the following unit prices shall be included in the nearest related unit prices. B. The unit prices as listed in Document 005100, "Proposal/Contract" are defined as follows: 1. Hatchery Process Water Distribution Valves - Includes all materials, labor, and equipment necessary to furnish 24 - 4-inch resilient seated butterfly valves, stems, gear boxes (operators), and all associated fittings for valves as shown on the Contract Documents. This item also includes delivery costs. This item shall be measured as a complete unit of work per each individual valve *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$61,416.00

Public - State/Provincial

Site Work

1

8

6

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
30
Bidding Soon
426
All Active Projects
180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

December 29, 2023

img_map_placeholder

21186 State Hwy 174, Mount Vernon, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.