BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Southington, Connecticut. Completed plans call for the renovation of a 121,207-square-foot educational facility.

The Town of Southington, Connecticut is seeking bid proposals for the re-roofing of approximately 121,207 square feet of existing roof area at Southington High School, 720 Pleasant Street, Southington, Connecticut. Prospective bidders shall examine the Supplementary General Conditions and Special Conditions and shall comply and conform strictly with the conditions and instructions contained therein. A Bid Bond of ten percent (10%) of the bid amount is required. The selected bidder will be required to post Performance and Payment Bonds in the full amount of the Contract Sum. The selected firm must meet all municipal, state and federal AA and EEO practices and requirements. MBEs/WBEs/SBEs are encouraged to apply. This contract is subject to state contract compliance requirements, including non-discrimination statutes and set-aside requirements. State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract be set aside for award to subcontractors holding current certification from the Connecticut Department of Administrative Services. The contractor must demonstrate good faith effort to meet the 25% set-aside goals. The Town of Southington reserves the right to reject and all bids in whole or in part or may waive any informalities in the bid, if, in its opinion, it is in the best interests of the Town to do so. All bid documents must be completely filled out when submitted. Bids must be firm and may not be withdrawn for a period of 90 days following the bid opening. Bids may be held by the Town of Southington for a period not to exceed ninety (90) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidder prior to awarding the contract. To comply with the calendar school year indicated in the Supplementary Instructions to Bidders, demolition can commence on or after June 17, 2024, and work for the entire project must be substantially complete on or before August 16, 2024. All questions about the proposals should be directed to Peter J. Romano, Director of Operations, by e-mail at promano@southingtonschools.org no later than 3:00 PM November 9, 2023. Answers to all so received questions shall be posted by November 13, 2023 on the Southington Schools The Town of Southington reserves the right to award any one service or group of services or all services, to negotiate with any or all companies submitting proposals, and to enter into an agreement with any company for any services mentioned in this ITB; if it is deemed to be in the best interest of the Town. Confidentiality - If Respondent believes that any information in its proposal should be treated as confidential that material shall be clearly marked. The Town shall endeavor to protect confidential material from disclosure to non-Town employees to the extent required by State or Federal law. In no event will the Town be responsible for the inadvertent disclosure of your response to this ITB.

Bid Results

Educational

$2,098,255.00

Public - City

Renovation

8

15

6

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
287
Bidding Soon
4,511
All Active Projects
1,923
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 17, 2023

June 18, 2024

img_map_placeholder

720 Pleasant St, Southington, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.