BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Palisade, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Colorado Division of Parks and Wildlife is accepting bids for gravel roadway and parking lot improvements at the Cameo Shooting and Education Complex. Principal items of work include scarifying existing gravel roadways and parking lots, improving drainage, regrading, moisture conditioning, compacting, and application of magnesium chloride. Additional road base material will also be imported and placed in areas where existing road base has eroded. The project consists of gravel roadway and parking lot improvements at the Cameo Shooting and Education Complex. Principal items of work include scarifying existing gravel roadways and parking lots, improving drainage, regrading, moisture conditioning, compacting, and application of magnesium chloride. Additional road base material will also be imported and placed in areas where existing road base has eroded. All work shall be in compliance with these specifications and construction drawings. Contractor shall not subcontract any portion of the work without written consent of the Project Manager, which consent shall not unreasonably be withheld. In cases where such consent is given, the Contractor shall perform with his own organization work amounting to not less than 50 percent of the total contract cost, as determined by the Project Manager, except that any items agreed to by the Project Manager as "specialty items" may be performed by subcontract and the cost of any such specialty items so performed by subcontractor may be deducted from the total cost before computing the amount of work required to be performed by the Contractor with his own organization. However, under no circumstances shall less than 20 percent of the total contract cost be performed by the Contractor's organization after deduction of specialty items. Furnish all labor, materials and equipment required as additional work for completion of the project. The deadline for questions is November 6, 2023 at 11 am. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self Service (VSS) website.

Award

Roads / Highways

$72,325.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
94
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

November 20, 2023

img_map_placeholder

3934 I 9/10 Road, Palisade, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.