BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Waterloo, Iowa. Completed plans call for the renovation of a post-secondary education facility.

https://wcfcourier.com/news/local/education/hawkeye-community-college-board-remodeling-project/article_5aba9054-7267-11ee-9994-7b3e3cc818ae.html ATERLOO — The lobby of Hawkeye Community College’s administrative building will be renovated for the first time in nearly a decade. The board of trustees Monday approved seeking bids for the remodeling project at Hawkeye Center, which will be paid for through the plant fund. Construction costs are estimated at $485,000. Design fees and a contingency fund are estimated at $163,000. Administration officials noted that “brightening up” the center, moving the reception desk and updating the Hawkeye mural are part of the project. Cost estimates for furniture, which will not be included in this bid, are undetermined at this point. Hawkeye Center, the administrative heart of the campus, is often a visitor’s first impression of the college. Financial aid, admissions, student services, the business office and public safety are all housed there. It is also the building frequented by both current and prospective faculty and staff for human resource services. In addition, the building houses the offices of the president and Hawkeye Foundation as well as hosting many meetings including gatherings open to the public such as the monthly trustees meeting. Angela Stirm-McLaughlin Hawkeye Center has gone through two renovations since it was built. In 2008 the metal and glass grand staircase was added to the main rotunda and in 2015 the center had some minor updates to make the lower level restrooms compliant with the Americans with Disabilities Act. RDG Planning and Design of Omaha, Nebraska, is the project’s designer. The board will hold a public hearing Nov. 28 on the improvements and consider approving a contract. Construction is set to start in December with the renovation work completed in March. As Hawkeye Center gets a facelift, the Cedar Falls Center, which houses business and community education classes, is looking to expand as well. Trustees unanimously approved a motion to enter into a lease with D & D Midwest Investments for a temporary lab space at 5611 Westminster Drive until September 2025. Hawkeye will use the area as a lab space for its Youth Summer Construction Program, Floor Covering Apprenticeship and Carpentry Apprenticeships. Hawkeye will pay $1,250 monthly for the 1,872-square-foot space. -------------------------------------------------- Project consists of the following Work: Minor renovation of the existing Hawkeye Center Lobby.

Post-Bid

Educational

$750,000.00

Public - State/Provincial

Renovation

26

14

25

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
54
Bidding Soon
575
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2023

December 28, 2023

img_map_placeholder

1501 E Orange Rd, Waterloo, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.