Renovation of a laboratory facility in Louisville, Kentucky. Completed plans call for the renovation of a laboratory facility.

Description and location of Project: The principal features of the Work to be performed under this Contract include, but are not limited to the following: 1. General: The purpose of this project is to design upgrades to the Cedar Creek WQTC, Floyds Fork WQTC, and Hite Creek WQTC Regional Labs. The upgrades are necessary to update lab equipment, replace old and worn cabinetry and counters, and address code violations discovered at the labs. 2. Hite Creek and Floyd's Fork: a. Architectural: 1) Demolish all casework, fume hood, and cabinetry. 2) Provide all new casework and countertops. 3) Paint existing ceiling grid and replace tiles. 4) Repair and refinish floor. 5) Refinish walls. b. Mechanical 1) Replace existing split system heat pump. 2) Locate roof mounted condensing unit greater than 10 feet from roof edge. 3) Provide a new louver at opposite side of building from current location and provide new ductwork to route outside air to new indoor air handling. 4) Provide a new exhaust fan. 5) Provide a new muffle oven that has direct vent capability. Duct vent using double wall insulated ductwork to the roof. 6) Demolish existing fume hood exhaust gooseneck. c. Plumbing 1) Demolish existing sinks and provide new replacements at same location. 2) Add a new small sink. 3) New undercounter dishwasher. 4) Demolish existing safety shower. Provide new safety shower at a new location. a) Provide a new 120-gallon, 1.5 kW storage type water heater in pipe gallery basement below the lab dedicated for emergency shower. b) Route new supply piping to emergency shower. c) Provide a floor drain for emergency shower. d. Electrical 1) Demolish existing lighting fixtures and replace with LED lighting at same location. 2) Relocate receptacles from existing location in casework to wall mounted receptacles. 3) Provide monument type receptacles in island countertop. 4) Provide power to new general space exhaust fan. 5) Provide dedicated circuit to new muffle oven. 6) Provide power to new HVAC split-system heat pump. 7) Provide power to new 1.5 kW, 120-gallon, electric water heater. 3. Cedar Creek: a. Architectural: 1) Demolish all casework, fume hood, and cabinetry. 2) Provide all new casework and countertops. 3) Paint existing ceiling grid and replace tiles. 4) Repair and refinish floor. 5) Refinish walls. b. Mechanical 1) Demolish existing general exhaust fan and provide a new exhaust fan to exhaust 1.0 cfm/sq. ft. 2) Rebalance the VAV system. Existing supply ductwork and distribution to remain. 3) Demolish existing fume hood and roof vent. Infill roof penetration. 4) Existing muffle oven with direct vent to remain. c. Plumbing 1) Demolish existing sinks and provide new replacements near same locations as existing sinks. 2) New undercounter dishwasher at different location. 3) Demolish existing safety shower. Provide new safety shower at a new location. a) Provide a new 120-gallon, 1.5 kW storage type water heater for emergency shower. (1) Existing mechanical closet is not large enough for new heater. Newheater could be located in the utility closet near the lab. (2) Route new supply piping to emergency shower. b) Provide a floor drain for emergency shower. d. Electrical 1) Demolish existing lighting fixtures and replace with LED lighting at same location. 2) Relocate receptacles from existing location in casework to wall mounted receptacles. 3) Provide monument type receptacles in island countertop. 4) Provide power to new general space exhaust fan. 5) Provide dedicated circuit to new muffle oven. 6) Provide power to new HVAC split-system heat pump. 7) Provide power to new 1.5 kW, 120-gallon, electric water heater. All work shall be done in accordance to MSD's Standard Specifications. The revised MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) is effective June 1, 2020. If selected as applicable above, the goals are as follows: 18.0% MBE - African American, 2.0% MBE - Asian-Indian American and 15.0% WBE - Caucasian Female participation respectively required for this project. The Project Manager for this Invitation to Bid is Julie Potempa. All inquiries and questions prior to the bid opening shall be Directed, in writing, to MSD's Project Manager, Julie Potempa at julie.potempa@louisvillemsd.org. Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. MSD reserves the right to reject any or all bids or waive any informality in any bid. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Engineer's Construction Cost Estimate for this project is between $ 750,000.00 and $ 1,200,000.00 .

Award

Laboratories

$990,000.00

Public - County

Renovation

86

26

12

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
32
Bidding Soon
900
All Active Projects
360
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

July 22, 2024

img_map_placeholder

Multiple Locations, Louisville, KY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.