Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Wayne, Nebraska. Completed plans call for the renovation of a educational facility.
Scope of work includes but is not limited to the following: Upgrading the electrical service, including medium voltage transformer, primary electrical feeders, and service entrance equipment; new panelboards throughout, and circuiting for owner furnished window air-conditioning units. A. The project design is based on, but not limited to, the following codes, regulations and guidelines, including: 1. Nationally published amendments. 2. Local amendments. B. Additional requirements may be indicated in individual Specification sections. C. The Contractor is not required to ascertain that contract documents are in accordance with applicable laws, statutes, ordinances, building codes and rules and regulations, unless they bear upon construction means, methods, techniques or safety and health precautions, but any nonconformity discovered by or made known to the Contractor shall be reported promptly to the Design Team. A. The Contractor shall furnish all labor, materials, tools and equipment, and perform all work and services necessary for or incidental to providing, constructing, furnishing and installing, complete, all temporary facilities and controls and subsequent removal as shown on the Drawings, and as specified, in accordance with the provisions of the Contract Documents, and completely coordinated with work of all other trades. B. Although such work is not specifically shown or specified, furnish and install all supplementary or miscellaneous items, appurtenances and devices incidental toor necessary for a sound, secure and complete installation. The Specifications consists of furnishing all labor and materials (unless otherwise specified) and in performing all operations necessary for the installation of the complete electronic and electrical system as required by terms and conditions of the Contract. The work shall also include the completion of such details of electrical work not mentioned or shown which are necessary for the successful operation of all electrical and electronic systems described on the drawings or required by these Specifications. C. The work in this Contract involves the installation of new work as well as work on the Site and may include demolition and renovation work. It shall be this Contractor's responsibility to visit the site so that he may ascertain all existing conditions which may affect the work under his Contract. No additional compensation will be granted for additional work required by this Contractor for his failure to visit the jobsite and determine existing conditions. This Contractor shall provide all labor and materials required to complete the work described in the Plans and Specifications and as may be required for a ready to operate installation. D. Generally the removal and repairing of existing floors, walls, ceilings, etc., in the remodeled areas where required for the installation of conduit, lights, panels, etc., shall be provided by the General Contractor under the direction of this Contractor. Holes required through floors, walls, and roof of the building shall be provided by this Contractor. If specifically shown to be done by this Contractor, this Contractor shall include in his Contract price the removal and replacement of general construction materials as required.
Award
Educational
$322,865.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 11, 2024
January 19, 2024
1111 Main St, Wayne, NE
Related To This Project
Wayne, NE
Bid Date: Mar 04 2024
Wayne, NE
Bid Date: Mar 14 2024
Wayne, NE
--
Wayne, NE
Bid Date: May 01 2024
Wayne, NE
Bid Date: Jun 27 2024
Wayne, NE
Bid Date: Jul 02 2024
Wayne, NE
Bid Date: Jan 08 2019
Wayne, NE
Bid Date: Oct 23 2023
Wayne, NE
--
Wayne, NE
Bid Date: Feb 15 2022
Wayne, NE
Bid Date: Jan 12 2022
Wayne, NE
Bid Date: Feb 17 2022
Wayne, NE
Bid Date: Mar 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.