BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work and new construction of a municipal facility in Brownwood, Texas. Completed plans call for the construction of a 19,000-square-foot municipal facility; and for site work for a municipal facility.

As of October 31, 2025, this project was completed over a year ago. A Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total bid shall be submitted with each Proposal. A certified check or bank draft, payable to the order of the CITY OF BROWNWOOD, negotiable U.S. Government bonds (at par value), may be substituted in lieu of a Bid Bond RFQ/RFP, including the provision of bid, performance and payment bonds The City of Brownwood reserves the right to reject any or all proposals or to select the Proposal that provides the best value to the City. The City reserves the right to waive any irregularity or defect in any of the Proposals received. The design and construction of improvements to an existing approximately 19,000 square foot building located at 305 Booker, Brownwood, Texas to house the City of Brownwood/Brown County Health Department (the Health Department Building). No cost information is to be included in any Qualification Submission.

Occupancy

Municipal

$1,671,152.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
25
Bidding Soon
409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2023

March 4, 2024

Project location map

305 Booker St, Brownwood, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.