BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 21, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Walker, Michigan. Completed plans call for site work for a sidewalk / parking lot; road / highway; for paving for a road / highway; and sidewalk / parking lot.

4 Mile Road Sidewalk Gap. Question Deadline 11/15/2023 at 2:00 PM ET. Any and all communication regarding this Solicitation shall be on the Kent County Purchasing Division Inquiry Blog via the online If the tested strength does not meet the rejection limit specified in Table 2, the Engineer will require additional evaluation as described in section e of this special provision. SCOPE Dimensions, if furnished, are for general reference only and should be verified by Respondent. Kent County will award and contract for the goods and services in this Solicitation in an efficient and timely manner. In no event will notification of award be more than 45 days from the date of submission. A project sign is to be installed in a prominent and accessible location at the project work site to inform the public of project activity and to post required notices outlined in the Federal Labor Standards. The project sign is to be maintained in good condition throughout the entire construction period. Format and size requirements are to be provided by the County. Each offer over $500,000 must be accompanied by a Bid Bond executed by the Respondent and payable to County of Kent for 5% of the total amount of the offer. Each contract over $50,000 must be accompanied by a Performance Bond and a Payment Bond, each payable to the Owner (County of Kent) and each in the amount of 100% of the contract price with a corporate surety approved by the funding agency, for the faithful performance of the contract. The Kent County Purchasing Division, on behalf of City of Walker, is soliciting bids for the construction of 4 Mile Road Sidewalk Gap from Cordes Ave to Old Orchard Drive. This award will be funded in part by Kent County's Community Development Block Grant ("CDBG"). Work to begin no earlier than 10 days after Award or as directed by Engineer with substantial completion and open to vehicle and pedestrian traffic by April 15, 2024 with final completion no later than May 17, 2024 Kent County reserves the right to determine the response format or not respond, at its sole discretion.

Award

Sidewalks / Parking Lot

$164,127.00

Public - City

Paving, Site Work

8

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
118
Bidding Soon
1,192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

December 21, 2023

Project location map

Old Orchard Dr NW, Walker, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.