BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, remodeling and renovation of a municipal facility in Chinle, Arizona. Completed plans call for the remodel of a municipal facility.

Project Description DESCRIPTION OF WORK AND SERVICES: The contractor shall review and analyze this scope and associated drawings for coordination of materials, and the necessary labor and equipment in order to provide a bid for the activities described. The following are important informational items that should be considered in the bid. 1. Mobilize equipment required to rehabilitate the berm per the plans and specifications (P&S), as provided for in the bid schedule. Dust control shall be incorporated into the cost of other line items. SWPPP cost will be incorporated into the Mobilization CLIN. 2. Provide labor, equipment and materials required to reconstruct the berm as specified in the P&S. 3. Provide labor, equipment, and riprap material to armor the water side of the berm as shown in the P&S. The stone will be paid by the ton unit price and shall include all costs to procure, haul, store and place the stone on the berm. 4. Provide local survey to record the constructed features as best as possible with respect to control point, including features such as top of berm, berm alignment, and riprap footprint. 5. Meetings and Communication. The contractor shall account for and plan to hold a morning safety meeting, including with representatives of USACE, prior to the commencement of every workday. The morning safety meeting shall be accounted for in the cost of berm reconstruction. In addition, the contractor should plan on holding a general weekly progress meeting to discuss accomplishment, workload, and schedule. The contractor shall be responsible for creating a forward-looking schedule for discussion purposes during regularly scheduled meetings. 6. Submittals. The contractor shall include with their overall price proposal the cost of providing all construction submittals. The cost of submittals shall be accounted for in the cost of berm reconstruction. 7. Safety and Security: Reference EM 385-1-1, contractor quality control shall conduct and document daily safety inspections. 8. Demobilize site and equipment as provided for in the bid schedule. But not limited to please review the specifications for more information. Magnitude of Construction: $1M - $5M

Post-Bid

Municipal

$10,000,000.00

Public - Federal

Remodeling, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
1
Bidding Soon
30
All Active Projects
13
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

November 27, 2023

img_map_placeholder

4600 Navajo Route 7, Chinle, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.