BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Valdosta, Georgia. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

Site Directions: Valdosta Regional Airport. Project location is adjacent to existing Air Traffic Control Tower. The Base Bid includes the construction of a new Airport Traffic Control Tower. The proposed Airport Traffic Control Tower includes a below grade mat foundation, structural steel framing, precast concrete wall panels, and some brick facade. Bid security in the form of a bid bond, made payable to Valdosta - Lowndes County Airport Authority, Georgia, equal to five (5) percent of the total bid is required. Contract security in the form of 100% Performance and Payment Bonds will be required. No bid may be withdrawn after closing time for the receipt of bids for a period of One Hundred and Twenty (120) days. A Notice-of-Award for the Contract will be issued once a successful bidder has been determined and funding has been secured. The Valdosta - Lowndes County Airport Authority reserves the right to waive any informalities or irregularities in the bids received and to reject any or all bids or to award or refrain from awarding the contract for the work, whichever is deemed to be in the Owner's best interests. Questions of a technical nature should be directed to 601-520-5495, or email at clowery@holtconsultingco.com, Attn.: Chris Lowery, Project Manager. The last day for questions will be Wednesday, December 6, 2023, by close of business. Bidding and Contract Documents will be ready for distribution to contractors on Monday, October 30, 2023. Pre-Qualification: Yes Bid guarantee of 5% (49 CFR Part 18.36(h)(1)) Performance Bond of 100% (49 CFR Part 18.36(h)(2)) Payment Bond of 100% (49 CFR Part 18.36(h)(3)) The DBE participation goal is 7.83% Construction contract time for Replacement Airport Traffic Control Tower Project, if awarded, will be completed in: Base Bid Award - Three Hundred Sixty-Five (365) Consecutive Calendar Days from the date of Notice-to-Proceed.

Bid Results

Transportation Terminals

$235,000.00

Public - County

New Construction, Site Work

147

24

42

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
27
Bidding Soon
368
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2023

February 12, 2024

img_map_placeholder

1750 Airport Rd, Valdosta, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.