BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and new construction of a mixed-use development in Novato, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; bridge / tunnel; sidewalk / parking lot; bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Reference Number 0000339579 All of the work to be performed is within the City of Novato and generally consists of transportation and pedestrian improvements on Grant Avenue. Work includes demolition of a portion of the existing bridge, sidewalks, curb and gutter and cold planing the existing roadway surface, along with construction of a new bridge structure, new curb and gutter, accessible curb ramps, asphalt overlay, storm drain, street lighting and revegetation planting. The primary focus of this project is to widen and rehabilitate the existing bridge to accommodate bike lanes and sidewalks, replace substandard bridge railings, and stabilize the banks and channel of Novato Creek to minimize scouring of bridge foundations. Job Location Grant Ave between Virginia Ave and 8th St Time for Completion - 180 Working Days Question Acceptance Deadline 02/01/2024 at 2:00 PM PT Questions are submitted online Yes For any additional information or technical questions please contact Gosia Woodfin, Project Engineer, at (415) 899-8997 or gwoodfin@novato.org. Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Certified Payroll - Contractors License Required - Federally Funded - Insurance Required - License Required - Material Safety Data Sheets Required - Prevailing Wage Required Contractor shall possess the following license: Class A (General Engineering Contractor). Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Labor and Materials Bond 100 % The Engineer's Estimate for the Base Bid is $2,800,000.

Bid Results

Bridges / Tunnels

$2,767,157.00

Public - City

Demolition, New Construction, Paving, Site Work

50

19

22

6

Subscribe For Documents

129 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
78
Bidding Soon
1,723
All Active Projects
719
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

April 8, 2024

img_map_placeholder

Grant Ave, Novato, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.