Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Plymouth, California. Completed plans call for site work for a water / sewer project.
Directional Boring and Sleeve Pipe Installation. The Contractor shall perform Directional Boring and Sleeve Pipe Installation and will be compensated in accordance with the service rates on Exhibit B-1, Public Works Rate Sheet. The Contractor shall include all labor, equipment, parts, devices, materials, tools, installation, supervision, inspection, training, licenses, permits, insurance, bonds, transportation, travel and per diem and any other costs necessary to perform services for the California Department of Corrections and Rehabilitation (CDCR), Inmate/Ward Labor (IWL), located at Mule Creek State Prison (MCSP), 4001 Highway 104, Ione, CA 95640. If progress payments are indicated in the Agreement documents, a faithful performance bond in the sum of not less than one hundred percent (100%) of the total amount payable under the Agreement is required. Payments will not exceed ninety percent (90%) of the Agreement amount. Any funds so withheld may be paid upon completion of the project. If progress payments are provided for in the bid and the Contract amount exceeds $10,000, The Contractor shall possess a valid "A" General Engineering Contractor's License issued by the California Contractors State License Board (CSLB) or a C-34 California Pipeline Contractor's specialty license issued by CSLB A licensed contractor shall not submit a bid to a public agency unless his/her contractor's license number and class appear clearly on the bid, the license expiration date is stated, and he/she has signed a certification statement that the representations made in the bid with regard to the license number, class and expiration date are made under penalty of perjury. Any bid not containing this information or a bid containing information that is subsequently proven false shall be considered non responsive and shall be rejected. Pursuant to Exhibit D, Prosecution of the Work, liquidated damages are hereby set at $500 per day for each day the Contractor fails to complete work past the specified service term of the Agreement. Question Deadline 12/05/2023 at 3:00 PM PT Nothing in this Agreement shall act as a waiver of any rights the State has or may have in the future to recover any economic or property damages caused by the Contractor's work, or failure to perform required work, whether the damages occurred before or after the completion of the Contractor's work. If the Agreement provides for liquidated damages, Contractor acknowledges the Department will suffer damage by any delay in the completion of the Work of the Project and that the exact and actual amount of such damages are difficult to estimate or predict in advance. Therefore, Contractor agrees that if Contractor fails to complete the Work of the Project within the Contract Time as specified or as adjusted by Change Order, Contractor authorizes Department to deduct Liquidated Damages, as outlined in Exhibit A, chargeable to the Contractor from any funds due or that become due to Contractor.
Post-Bid
Water / Sewer
$300,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 20, 2023
January 19, 2024
4001 CA-104, Plymouth, CA
Related To This Project
Plymouth, CA
Bid Date: Nov 21 2023
Plymouth, CA
Bid Date: Jan 25 2022
Plymouth, CA
Bid Date: Sep 13 2023
Plymouth, CA
Bid Date: Jun 08 2023
Plymouth, CA
Bid Date: May 16 2023
Plymouth, CA
Bid Date: Mar 09 2023
Plymouth, CA
Bid Date: Sep 04 2024
Plymouth, CA
Bid Date: May 25 2022
Plymouth, CA
Bid Date: May 24 2022
Plymouth, CA
Bid Date: Jan 18 2023
Cty of Cmmrce, CA
Bid Date: Dec 05 2023
East Los Angeles, CA
Bid Date: Jun 03 2024
Los Angeles, CA
Bid Date: Nov 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.