Site work for a water / sewer project in Georgetown, South Carolina. Working plans call for site work for a water / sewer project.

The proposed work consists of new work and maintenance dredging to improve navigation access and discharging sediment in a proposed nearshore (open water) disposal site using a hydraulic pipeline. In detail, the applicant has proposed to dredge a total of 754,616 cubic yards of sediment from a total of 87,087 linear feet (16.49 miles) of natural creeks and man-made channels. The location of these open water channels, Main Creek, Marshwalk (Channels A, B, C, and D), Parsonage Creek, Oaks Creek, Allston Creek, Flaggpoint Canal, Mt. Gilead Canal, Marlin Quay Marina, South Waccamaw Canal, and Creeks A, B, C, D, E, F, G (Marina Colony), H, I, J and K, is shown on drawing sheets 1 through 27 of 39 in the public notice. The proposed work would be conducted in three phases. Approximately 250,000 cubic yards of sediment would be dredged each year (between November 1 and March 31) using a hydraulic cutterhead and would be pumped via pipeline to a proposed nearshore disposal site that would be parallel to the shore at Huntington Beach State Park (HBSP). Dredged material with a high percentage of fines is expected to spread across the ocean floor as a layer of fluid mud. The dredged material would be discharged within an approximately 3,500-foot long by 1,000-foot wide area that would be at least 1,700 feet south of the existing jetty and at least 2,000 feet east of the existing beach at HBSP as shown on drawing sheet 39 of 39. The proposed nearshore disposal site would be 5,000 feet long by 3,000 feet wide (344.35 acres or 0.57 square miles) and would be monitored to ensure that the placement of dredged material does not create a layer that is more than 5.5 feet thick on the existing ocean floor, and dredged material does not extend or adversely impact aquatic resources outside the boundary of the proposed disposal site. According to the applicant, the dredged material would be placed outside the active surf zone and any clays or other fine-grained material would be carried offshore rather than deposited on the adjacent beach.

Final Planning

Water / Sewer

$50,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
53
Bidding Soon
491
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

February 1, 2024

img_map_placeholder

Multiple Locations, Georgetown, SC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.