BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2024 at 7:00 PM

Updated January 27, 2024

Site work and paving for a road / highway in Bennett, Colorado. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of January 9, 2024, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to November 2024. *The closed solicitation has been included below for reference: Reference Number 0000334283 Question Acceptance Deadline 11/14/2023 at 12:00 PM MT Questions are submitted online No All technical inquiries regarding this RFP shall be made in writing to Daymon Johnson - djohnson@bennett.co.us by the date specified in the above project schedule. Non-technical inquiries may be directed to Daymon Johnson - 303.644.3249 x1005 The Town of Bennett is seeking proposals from qualified trail design consultants & firms, who have verifiable experience in trail design and development, to design approximately 3.5 miles of 8 to 10-foot wide concrete, partially motorized (maintenance only), non-equestrian-use trails, using sustainable trail development principles. The trail alignment includes significant Kiowa Creek floodplain lengths and areas, requiring permitting, design/improvement and impact mitigation considerations and requirements. The trail utilizes the existing I-70 Kiowa Creek bridge as a trail underpass under I-70, requiring further floodplain and bridge hydraulics impacts and mitigations. PROJECT DESCRIPTION: The Kiowa Bennett TIP Trail consists of 3 segments. Segment 1 is the North Segment which runs North & South along the east side of State Highway 79, terminating near the existing QuikTrip. Segment 2 is the middle or Central Segment, which runs from the Southernmost point of Segment 1, heads East and proceeds to the I-70 Corridor underpass in alignment with Kiowa Creek. Segment 3 of this trail is the South segment, which takes the trail from Kiowa-Bennett Road, through the Kiowa Creek North Open Space, connecting to the Southernmost point of Segment 2 The Town reserves the right to reject all Proposals and re-solicit if deemed by the Town to be in its best interests, and to abandon the Project and this RFP at any time for any or no reason. Buyer Preferences, Guidelines & Requirements General Requirements - Federally Funded - Insurance Required - License Required

Conceptual

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
59
Bidding Soon
1,279
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2024

Project location map

N Kiowa-Bennett Rd, Bennett, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.