BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Indianapolis, Indiana. Completed plans call for site work for a educational facility; and water / sewer project.

The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Women's and Veteran's Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive. Should a successful Bidder withdraw his bid, or fail to execute a satisfactory Contract within ten days after notice of acceptance of bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as penalty Pre-bid questions shall be submitted to the Owner Representative for inclusion of all answers and distributed to all bidders via Addenda. All documents included in Contract Documents create the work summary in total for said project 1.2 Work Sequence should be coordinated with Owner and CustomerAll documents included in Contract Documents create the work summary in total for said project 1.2 Work Sequence should be coordinated with Owner and Customer Project Utility Sources 1.1 Notification of Utility Companies - The General Contractor, in accordance with local laws and ordinances, shall notify appropriate utilities, with copy to the Owner's Representative and Owner, not less than 48 hours in advance of any excavation or work in, around or on utility lines. 1.2 Protection and Maintenance of Existing Utilities - Existing utilities are shown in the Contract Documents in their approximate locations from available information. The General Contractor shall ascertain exact locations of utilities that may be affected by the work of all Prime Contractors on this Project, and shall be responsible for the protection and maintenance of such utilities, and shall be responsible for any damage or injury that may result from working on or near these utilities. 1.3 Utilities Not Indicated - If existing utilities are encountered which are not indicated on the drawings, the General Contractor shall protect such utilities and notify the Owner's Representative and the Owner of their presence. If any such utilities not indicated on the drawings, which are to remain in service, are damaged by any of the Prime Contractors, the General Contractor shall take such action as reasonably required to minimize the damage and shall promptly restore the system to operating condition as directed by the Project Engineer and the Owner's Representative. 1.4 Owner-Provided Systems - The Contractor shall in no circumstances tap into Ownerprovided systems, including but not limited to steam, without prior notice to the Owner. Upon obtaining the Owner's consent, the Contractor shall schedule the tap-in at a time when Owner's personnel can be present. If Contractor fails to comply with this provision, Contractor shall be reimburse the Owner for all costs incurred, including but not limited to all damages incurred and not covered by Builders Risk insurance for any reason, whether to property included or not included within the original scope of work. 1.5 Review project requirements for natural gas, electric power, domestic water, sanitary sewer, storm water drainage, chilled water, hot water, and steam with IU Engineering Services and IU Utilities

Award

Water / Sewer

$249,400.00

Public - State/Provincial

Site Work

10

13

2

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
52
Bidding Soon
868
All Active Projects
395
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 21, 2023

December 21, 2023

img_map_placeholder

To Be Determined, Indianapolis, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.