BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to an educational facility in Spartanburg, South Carolina. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

**As of January 10, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** The scope includes additions to Jesse Bobo and Roebuck Elementary Schools Spartanburg School District Six (SCSD6) invites responsible firms or individuals to submit a sealed proposal to provide external security services for the Dorman High School Campus on an annual contract with four (4) renewal options. All questions must be addressed to Ryan Henkes (rhenkes@spart6.org). Deadline for questions is 5pm on October 30, 2023. The district reserves the right to accept or reject any/all proposals or any part of any proposal. This includes rejection based upon quality (in the opinion of the district) from references, delivery or any other reason. Jesse Bobo Elementary School The scope of work for this project includes the construction of a six classroom addition, interior renovations to the administrative suite and façade improvements. The construction of the addition and the renovation will include load-bearing masonry with a steel bar joist roof framing system. Exterior finishes will include a modified bitumen roof system, brick veneer, and storefront doors and windows. Interior finishes will include hollow metal frames with wood doors, paint, LVT, and terrazzo. Site work will include grading and utilities as required for the new construction. Roebuck Elementary School The scope of work for this project includes the construction of a two-classroom addition and a 10- classroom addition. The construction of the addition and the renovation will include load-bearing masonry with a steel bar joist roof framing system. Exterior finishes will include a standing seam metal roof system, brick veneer, and storefront doors and windows. Interior finishes will include hollow metal frames with wood doors, paint, LVT, and terrazzo. Site work will include grading and utilities as required for the new construction.

Post-Bid

Educational

$10,600,000.00

Public - County

Addition, Demolition, Site Work

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
55
Bidding Soon
1,121
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2023

January 29, 2024

img_map_placeholder

Multiple Locations, Spartanburg, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.