BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Stockton, California. Contact the soliciting agency for additional information.

Oakmore and Montego Park is undeveloped but there exists a site master plan and comprehensive construction drawings for the entire site (see Attachment C - Oakmore Montego Park Site Conceptual Master Plan and Attachment D - Oakmore Montego Park Construction Drawings). These drawings were completed in 2011 but bidding and construction were postponed due to budget constraints. At the time the drawings were prepared there were no street frontage improvements around the north, south and west sides of the park site, and no homes. Construction documents will need to be compared with current City park development Any question or request for clarification shall be submitted in writing to: Jessie.Garcia@stocktonca.gov. Requests for clarification shall be submitted at least seven (7) business days prior to the proposal due date Proposers are hereby notified that the successful proposer and any subconsultant under them shall pay prevailing wage rates in accordance with the State of California Department of Industrial Relations. Cannery Park (7.48 acres) includes master planning of the park (including public meetings) and preparation of comprehensive construction documents for this undeveloped neighborhood park site in the Cannery Park Subdivision. Improvements to include open turf areas, playgrounds, group picnic shelter, benches, picnic tables, drinking fountains, trash receptacles, a looped concrete pathway with pathway lighting, dog mitt dispensers, open turf areas, minimal waterwise landscaping, Calsense central control irrigation, and other site amenities and respective infrastructure. The Consultant shall provide preliminary and final engineering services leading to the completion of plans, specifications, and estimates for construction of the desired improvements. The Consultant shall also provide design support services during the construction phase of the project. Design support will endure through the completion of construction. The Consultant is encouraged to team with local consultants as much as possible to accomplish all tasks necessary to complete the project.

Conceptual

Playgrounds / Parks / Athletic Fields

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
55
Bidding Soon
1,880
All Active Projects
798
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

img_map_placeholder

Multiple Locations, Stockton, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.