BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Baltimore, Maryland. Completed plans call for the renovation of a 2,259-square-foot educational facility.

A. The Work of Project is defined by the Contract Documents and consists of the following: The goal of this project is to completely upgrade the restrooms of the Callaway Elementary school building # 251 1. Replace all plumbing fixtures (including floor mounted urinals with wall mounted, if applicable); 2. Finishes, including poured epoxy floor and tiling all walls and painting 3. Replace all partitions, including adding urinal screens. 4. Identify clean and flush all floor drains; and replace floor drain pan with a floor drain with trap primer. 5. Identify exhaust fan duct cleaning and include replacing the exhaust fan. 6. Replace all light fixtures with LED fixtures; coordinate with toilet partition locations. 7. Replace all toilet room accessories. 8. Bathroom signage. 9. Replace doors 10. Walls behind urinals to be faced with FRP panels. 11. Gender neutral student restroom to have HALO sensor. B. Restrooms to be made ADA accessible, where possible. Existing door openings will not be widened. New plumbing piping is not intended to be installed; plumbing is only intended to be reconfigured to the extent that if one stall could be removed to make a ADA accessible bath room if that is the intent. All designs shall be designed in accordance the current district design standards, including addendums. C. The school is approximately 77,850 sf. There is approximately 2,259 sf of restrooms in the building, including; PK/K, student group, individual, kitchen, mechanical room, and staff restrooms. The locker room restrooms are included in this scope, however, work in the locker rooms themselves is not included. A potential gender neutral restroom has been identified as the staff restrooms on the first floor adjacent to room 119.One restroom would be made to be unisex for staff and the other gender neutral for students. The City Schools project manager will obtain sign off from the school Principal confirming that location. D. Type of Contract: 1. Project will be constructed under a single prime contract. Restroom Upgrades at Callaway Elementary School #251 MBE Participation (%) 27.00 African American MBE Participation (%) 8.0 Women-Owned MBE Participation (%) 11.0 Questions Due by: 4:00 p.m. November 20, 2023 City Schools reserves the right to accept or reject any or all responses received as a result of this request, or to cancel this solicitation in part or in its entirety.

Bid Results

Educational

$1,694,450.00

Public - City

Renovation

98

23

4

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
98
Bidding Soon
2,368
All Active Projects
953
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

January 15, 2024

img_map_placeholder

3701 Fernhill Ave, Baltimore, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.