BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Miramar, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Miramar Public Works Department is inviting qualified Asphalt Contractors to submit quotes to install speed humps on asphalt roads within the City of Miramar. Each hump shall span across 2 lanes of traffic which is 24ft wide. Quote shall include labor, materials, equipment, supervision, insurance, maintenance of traffic, and all incidentals to perform the Work completely. Three (3) humps shall be installed on Dolphin Dr. between Miramar Parkway & Miramar Blvd. Questions regarding this Request for Quotation (RFQ) shall be made in writing to the Procurement Specialist for this solicitation, Jason Chong via e-mail at: jdchong@miramarfl.gov. Questions are due by Tuesday, November 7 th , 2023 @ 5:00pm The work shall commence ONLY after the contractor has been notified by the Public Works Department but within five (5) business days after receipt of purchase order. The work shall be completed within Forty-Five (45) days from the date of commencement. The City reserves the right to reject any or all quotes, to waive any irregularities in the Solicitation process, and to award or not award a contract based on this solicitation, as deemed in the best interest of the City The Successful Contractor shall provide all equipment, labor, and materials necessary to install three (3) traffic calming speed humps. All speed humps shall be installed in two (2) lifts of S3 Asphalt, and tack coat must be applied prior to laying S3 asphalt. One foot (1') solid white thermoplastic arrows must be used to mark the speed humps, and three (3) reflective pavement markers (rpm) on each side facing traffic. All work must be done in strict compliance with the drawings and specifications illustrated below. The installation of six (6) Speed Hump Ahead signs must also be installed based on specifications W17-1 of Manual on Uniform Traffic Control Devices (MUTCD) to be placed within one hundred Feet (100') of approaching the speed hump along with 18 delineators to be placed, three (3) per side, per speed hump in accordance with the MUTCD Section 3F.01. The delineators must be level flexible, white colored with reflective sheeting, and stand at thirty-six inches (36"). They must be bolted and caulked per manufactures specifications.

Award

Roads / Highways

$50,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
45
Bidding Soon
1,093
All Active Projects
483
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

December 14, 2023

img_map_placeholder

Dolphin Dr, Miramar, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.