BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Delray Beach, Florida. Completed plans call for the renovation of a 2,503-square-foot residential development.

The purpose of this Quick Quote is to solicit quotes from qualified contractors to Remove entire sloped roof covering. Replace damaged sheathing, replace / repair damaged rafters, and related roof components. All fascia, soffit repair/replacement is included in line item cost. Replace defective or damaged soffit venting/screening to match existing as needed. in accordance with the terms, conditions, and specifications contained in this Invitation to Quote. Bid Guaranty: Each submittal shall be accompanied by a bid guaranty, or other acceptable alternative, in an amount equal to five percent (5%) of the bid amount (Refer to Bid Guaranty, Performance and Payment Guaranties, and Qualifications of Surety Requirement. Bid Allowance Amounts: This solicitation includes a pass-thru allowance. It is not necessary to add your allowance amounts into your bid prices. Periscope S2G will automatically add the allowance amounts indicated to your bid total and will be reflected on the final bid tabulation. Undefined General Allowance ($3,000). The City of Delray Beach is exempt from Federal and State Taxes for tangible personal property tax. The City of Delray Beach reserves the right to accept or reject any or all Bids, in whole or in part, with or without cause, to waive any irregularities and/or technicalities, and to award the contract on such coverage and terms it deems will best serve the interests of the City. The City will NOT HOLD a Non-Mandatory Pre-Bid Conference . It is the responsibility of the Bidder to ensure all pages are included in the submission. All Bidders are advised to closely examine the solicitation package. Q & A deadline: Nov 20, 2023 5:00:00 PM Remove entire sloped roof covering. Replace damaged sheathing, replace / repair damaged rafters, and related roof components. All fascia, soffit repair/replacement is included in line item cost. Replace defective or damaged soffit venting/screening to match existing as needed. Contractors shall include in their bid replacing up to 48 lf of rafter/trusses top chords, and up to "5" full sheets of sheathing or 160 sq ft of exposed planking if needed Damage in excess of "5" Sheets of sheathing or 160 sq ft of planking and up to 48 lf of rafter/truss top chords shall be addressed in a change order. Replacement sheathing shall be minimum 19/32" plywood but may be thicker to match existing sheathing. In instances where the sheathing is an exposed ceiling, replacement sheathing shall match existing and may be planks. Contractors shall submit the installed unit cost for change order material above the covered damage as follows: Sheet of plywood sheathing (each) above the covered 5 sheets $ Square foot of planking above the covered 160 sq ft $ Liner foot of rafter/trusses top chords above the covered 48 lf $ Plywood sheathing joints shall be covered with a 4"-6" self-adhering bitumen, and plank or tongue and groove sheathing shall be covered with a double layer of ASTM 30 lb. felt paper. Secondary water barrier will be applied directly to the plywood sheathing. Contractor shall submit photos of the secondary water barrier when requesting payment for this item. All roof sheathing/decking nailing shall be brought up to meet the 2020 Florida Building Code 7th edition. Existing fasteners may be used to partially satisfy this requirement and additional nailing shall consist of the required ring shank nails. Install two (2) layers of ASTM 30 lb. felt paper for roof with a slope of less than 4" to 1'. Then install 40 year rated quality or equal, laminated (dimensional) shingle, self-sealing, fungus resistant fiberglass shingles, to meet the 2020 Florida Building Code 7th Edition. Install new ridge vent per shingle manufacturer's specifications over all roof ridge. New 3"x 3" metal drip edge (see note below) and flashing shall be installed throughout the entire roof system. The entire new roof system shall conform to building code of the City of Delray Beach Building Division. Note 1: Contractor shall replace existing 1"x 2" build-out for the drip edge at the top of fascia. If no 1"x 2" exists at the top of the fascia, the contractor shall install all new 1"x 2" primed and painted to match existing fascia color. Note 2: The metal drip edge shall be a minimum 3"x 3". Fastening of the drip edge shall be with nails placed into the sheathing, roof rafter, truss, or sub-fascia. No fasteners shall penetrate into the fascia or 1x2 wood drip edge nailer. Note 3: This item will have a mandatory inspection with the rehabilitation inspector. Note 4: Owner shall have choice of shingle color. Note 5: One 36" layer of self-adhering modified underlayment shall be placed above flashing in all valleys. Note 6: Replace deteriorated fascia and soffit. A minimum of 6 feet must be maintained between joints or corners. Fill all nail holes in all affected wood, seal with caulking the seams of joints of wood where they meet the soffit and prepare for paint apply one (1) coat of acrylic primer/sealer and two (2) coats of acrylic exterior grade paint. Paint is to match existing color as close as possible. Masonry grade paint or wood grade paint, as appropriate, shall be applied. Primer and paint shall be of the same manufacturer, Sherwin Williams or equal. Replace deteriorated soffit and venting to match existing as needed. Contract duration: One Time Purchase

Bid Results

Residential Subdivision

$20,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
53
Bidding Soon
1,162
All Active Projects
530
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

December 29, 2023

img_map_placeholder

To Be Determined, Delray Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.