Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 9, 2024 at 7:00 PM
Updated January 27, 2024
Renovation of a mixed-use development in Denver, Colorado. Completed plans call for the renovation of a educational facility.
CU Denver is addressing roof deck drainage problems and water infiltration at the 4th, 5th, and 6 th floor roof decks of the Business School. Existing composite decking on all three levels has been removed to prepare for permanent repairs and stopgap water barriers have been installed at the storefront doors to reduce ongoing water infiltration. The project includes a base bid, 8 construction alternates and a 9th alternate to include the cost to administer prevailing wage rates. CU Denver anticipates ultimately making repairs on all roof decks shown in the construction drawings. The base bid includes repairs and resurfacing to Deck 6C on level 6. Subsequent alternates are organized according to their level of priority. The entire project (base and alternates) involves installation of new cast-in-place concrete and polyacrylate underlayment (Division 3), masonry cavity drainage maintenance at the weepholes and vents (Division 4), decorative metal railings (Division 5), miscellaneous rough carpentry and plastic structural assemblies (Division 6), Dex-Flex waterproof traffic coating system, flashing, sheet metal and joint sealants (Division 7), openings, aluminum framed entrance and storefronts and glazing (Division 8), finishes, nonstructural metal framing, gypsum board systems, tile carpeting and interior painting (Division 9). The general contractor is responsible for removing, furnishing, and installing everything shown on the construction drawings per specifications. All debris and garbage generated from this project must be removed from the site by the general contractor. Coordinate all work with CU's construction manager to coincide with university operations. The Business School will remain occupied throughout much of the construction. The general contractor is responsible for providing all general conditions and general requirements including but not limited to on-site supervision, dumpsters, progress cleaning, etc. The general contractor will be required to provide for costs associated with installing during winter conditions such as snow removal, tenting, heating, etc. If the construction value is $50,000 or greater a Bid Bond and Power of Attorney or Proposal Guaranty is required in an amount not less than 5% of the total Bid. This Bid is accompanied by the required Bid Guarantee. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Director, State Buildings Programs, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance and Affidavit Regarding Unauthorized Immigrants. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of the General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor's Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract. The right is reserved to waive informalities and to reject any and all Bids.' Questions Due 2:00pm 11/21/23
Award
Educational
$98,365.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
