BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Loveland, Colorado. Conceptual plans call for the renovation of a municipal facility.

As of January 29, 2024, this project is in the conceptual phase. An architect has not been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Reference Number 0000334547 Question Acceptance Deadline 11/29/2023 5:00 PM MT Questions are submitted online No Questions concerning the RFP shall be directed only to Ashley Yaste, at Ashley.yaste@cityofloveland.org The City of Loveland, Colorado (City) is requesting sealed proposals to provide design services for the Municipal Building and Development Center Generator Replacement Project. The Loveland Municipal Building and Development Center Buildings are both supported by emergency generator and UPS systems. These systems were installed over 30 years ago and are now out of date and undersized for the current building capacity. The purpose of this project is to update these systems with other required exterior upgrades. The purpose of this request for proposals is to engage the services of an architectural and engineering team to integrate into the Citys overall design team through an abbreviated selection process. Requirements The selected Consultant will be expected to provide a full range of architectural and engineering services as described below. The work is expected to be delivered in four phases - Programming, Schematic Design, Design Development and Construction Documents. The scope of services generally consists of the following: 1. Electrical Design 2. Architectural Design 3. Structural Design 4. Landscape Design 5. Irrigation Design, if needed Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required The City reserves the right to reject any or all proposals and waive any informalities therein and to accept or reject any portion of the proposal if deemed to be in the best interest of the City to do so.

Conceptual

Municipal

$400,000.00

Public - City

Renovation

66

4

2

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
40
Bidding Soon
962
All Active Projects
405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

img_map_placeholder

500 E 3rd St, Loveland, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.