BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Schaumburg, Illinois. Contact the soliciting agency for additional information.

This project requires 25% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 26, 2024, at 9:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for engineering management and project support as well as other functions as necessary to accomplish Phase II services. The Consultant will be available to provide staff responsible for structural and pavement design, cost estimating and economic analysis, railroad and utility coordination, CADD unit plan drafting, joint agreement preparation & negotiation. The Consultant may also be required to provide project managers to manage various Phase II projects, which are under contract with other Consultant engineering firms and any other personnel to assist in various plan preparation work tasks as required. The Consultant personnel may be expected to perform work similar to an IDOT employee and is expected to perform the work at the District's office. Some work may be performed via a remote connection when appropriate. The completion date for this contract will be 60 months after authorization to proceed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Highways (Roads and Streets) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 03 - RFQ - Various Phase II Support and Engineering Management Projects

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
130
Bidding Soon
2,073
All Active Projects
885
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

img_map_placeholder

Multiple Locations, Schaumburg, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.