BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a laboratory facility in Columbia, Missouri. Completed plans call for the construction of a 23,000-square-foot laboratory facility; and for site work for a laboratory facility.

This project shall have a Supplier Diversity participation goal of 10% Minority Business Enterprise (MBE), 10% Women Business Enterprise (WBE)//Disadvantage Business Enterprise (DBE), and a 3% Veteran/Service-Disabled Veteran (SDVE) of the GMP. The Construction Manager at Risk is strongly encouraged to include minority and women owned firms. CMRs are also strongly encouraged to include Missouri-based firms on the team. The project is anticipated as a new approximately 23,000 gross square foot meat processing, education, and training facility for the University of Missouri Columbia campus with a $25,000,000 total project cost. The total project budget includes an estimated $21,300,000 GMP (primary construction contract budget for the new building). The facility will entail all aspects of slaughter, fabrication, further processing, and retail sales of meat animal species, and be operated by the College of Agriculture, Food, and Natural Resources (CAFNR) for student and stakeholder education and training. Project Schedule: -The design consultant selection process is on-going. Anticipated selection by December, 2023. -The GMP will be based on a Pre-Design Study/Report that will be submitted to MU by the Design Consultant on June 1, 2024. -The Guaranteed Maximum Price (GMP) is targeted to be submitted to MU by June 15, 2024. -The CMR is required to substantially complete the project not later than March 30, 2026. December 6, 2023 Pre-Proposal Meeting with short listed firms

Award

Laboratories

$21,300,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
25
Bidding Soon
346
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2023

January 9, 2024

img_map_placeholder

To Be Determined, Columbia, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.