BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Nashville, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 22% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 30, 2024, at 9:00 AM at the Region Five/District Eight Office in Collinsville. Phase I engineering services are required for all work associated with the preparation of preliminary engineering and environmental studies for IL Route 127 from I-64 Westbound Ramps to IL Route 15 in Washington County. The proposed improvement is for possible widening, both mainline and shoulders. This improvement may involve drainage, ADA, and intersection improvements. Public involvement will be required, as well as environmental studies. This work will involve all work necessary for the preparation of the Project Report, including but not limited to, environmental studies and coordination, Location Drainage Study, geometric studies, public involvement using Context Sensitive Solutions, Intersection Design Studies (IDS), traffic management plan, pickup surveys, and all other work necessary to complete Phase I and obtain Design Approval. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Location Design Studies (Reconstruction/Major Rehabilitation) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 23 - RFQ - IL Route 127 From I-64 WB Ramps to IL Route 15, Phase I Project, Washington County, Region Five/District Eight

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
44
Bidding Soon
728
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

img_map_placeholder

IL-127, Nashville, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.