Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 19, 2023 at 7:00 PM
Updated February 9, 2024
Site work for a municipal facility in Baton Rouge, Louisiana. Completed plans call for site work for a municipal facility.
Ashland Field in Natchitoches Parish. Evidence of authority to submit the bid will be required in accordance with R.S. 38:2212 (A)(1)(c) and/or R.S. 39:1594 (C)(2)(d). 1. Remove debris from well area to allow safe access to well site. Make necessary repairs on wellhead. Install blow out preventers and test to 29B standards. Verify that the hydraulic closure system is operational at all times. Check and record well pressure on tubing and casing. Kill well if necessary. Establish injection rates and pressure in the tubing (or production casing if tubing not present). Monitor casing pressure during injection or if necessary, pressure up on casing to determine tubing and casing integrity. Pressure test all casing strings and annuli to 300 psi. If no production packer present forego production casing pressure test. Note: Report all rates and pressures to District Office. 2. Pull and lay down rods, if necessary. Pull production tubing and packer from wellbore and lay down. Verify wellbore is cleaned out to CIBP OD size. 3. Set CIBP plug @ 2,800'. Tag CIBP. Place a minimum of 10' of cement above CIBP. 4. Set CIBP plug @ 1,450'. Tag CIBP and test to 300 psi. Place a minimum of 10' of cement above CIBP. 5. Spot 200' cement plug @ 620'-820' for USDW. 6. Perforate at 360' and squeeze a minimum of 100' of cement into annulus. Place 100' balanced plug in wellbore from 260'-360'. a. If unable to inject into perforations, place 100' cement plug inside of wellbore. Wait on cement 4 hours. Tag and pressure test cement plug to 300 psi. 7. Set 100' surface plug. Circulate balanced cement plug in the production casing. Using a small diameter pipe circulate a 100' cement plug in all casing annuli. Verify all casing annuli have cement at surface, if not top off. 8. Cut and remove wellhead 5' below ground level. Weld plate with serial number and date welded on to well. 9. Restore wellsite and restore any damage caused by P&A operations on the site and access route to well location. Removed all equipment associated with the production of this well.
Bid Results
Municipal
$741,344.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
January 8, 2024
Multiple Locations, Baton Rouge, LA
Related To This Project
Baton Rouge, LA
Bid Date: Nov 08 2023
Baton Rouge, LA
Bid Date: Nov 08 2023
Baton Rouge, LA
Bid Date: Nov 08 2023
Baton Rouge, LA
Bid Date: Feb 03 2021
Baton Rouge, LA
Bid Date: Dec 14 2023
Baton Rouge, LA
Bid Date: Nov 28 2023
Baton Rouge, LA
Bid Date: Nov 28 2023
Baton Rouge, LA
Bid Date: Dec 14 2023
Baton Rouge, LA
Bid Date: Feb 06 2024
Baton Rouge, LA
Bid Date: Nov 22 2023
Baton Rouge, LA
--
Baton Rouge, LA
Bid Date: Nov 14 2023
Baton Rouge, LA
Bid Date: Nov 15 2023
Baton Rouge, LA
Bid Date: Nov 29 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
