Published December 18, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a multi-residential development in Orlando, Florida. Completed plans call for the renovation of a multi-residential development.

As of December 18,2023, this project has not yet been awarded. A timeline for award has not yet been established. . Ufas/Accessible Office Renovations for Omega Apts. Question Deadline 11/16/2023 at 2:00 PM ET. liquidated damages. In the event of any violation of the immediately preceding subparagraph C.2, the Contractor and any subcontractor responsible therefore shall be liable for the unpaid wages. In addition, the Contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory) for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of such subparagraph, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty (40) hours without payment of the overtime wages required by the clause set forth in such subparagraph. WORK SCOPE The project is located at 2811 Gamma Drive, Orlando, FL 32810. The Bidder/Respondent is encouraged to visit the project site to verify conditions, and to attend a pre-bid conference. Change orders will not be approved for foreseen items overlooked by the bidder. Change Orders for unforeseen items must be preapproved. The following consists of the renovations noted below. furnish all labor, equipment, materials, transportation, and other necessary purchases to perform asbestos abatement and construct a UFAS Accessible Office Renovations at Omega Apartments. The Authority has established M/WBE participation goals to maximize opportunities for M/WBE as follows: Minority Business Enterprise (MBE) at eighteen percent (18%) and six percent (6%) for Woman Enterprises. Offerors claiming WBE/MBE must provide certification in the proposal. For all contracts that exceed $150,000, the successful bidder will be required to furnish and pay for the satisfactory Performance and Payment bonding in the amount of 100% of the contract price. The successful bidder will be required to furnish certificates of insurance in accordance with the General Conditions and Special Conditions. OHA reserves the right to reject any or all bids, to waive any informality in the solicitation process, or to terminate the solicitation process at any time, if deemed by OHA to be in its best interest. All questions requiring explanations and interpretations of the bid package must be submitted in writing to Liza Martinez Purchasing Manager by November 16, 2023, at 2:00 p.m. EST. You may email inquiries to liza.martinez@orl-oha.org The project is located at 2811 Gamma Drive, Orlando, FL 32810. The Bidder/Respondent is encouraged to visit the project site to verify conditions, and to attend a pre-bid conference. Change orders will not be approved for foreseen items overlooked by the bidder. Change Orders for unforeseen items must be preapproved. The following consists of the renovations noted below: 1. Demolish entry sidewalk and replace with new 5'-0" wide UFAS compliant sidewalk as noted on drawings a. Re-grade area and seed in disturbed areas 2. Demolish existing kitchen, laundry and bathroom and replace bathroom with the new UFAS compliant toilet room and fixtures. 3. Demolish existing walls as noted on plan 4. Demolish all existing flooring. a. Abate asbestos containing materials. Work must be performed by licensed/certified asbestos abatement contractor. 5. Remove and cap existing water, sewer, and electrical lines as necessary 6. Saw cut concrete floor as necessary for new plumbing fixtures 7. Remove existing light fixtures and replace with new surface mounted 1x4 fluorescent fixtures 8. Remove and replace the power panel 9. Furnish and install new UFAS compliant automatic handicap door opener with exterior pedestal mounted device 10. Furnish and install new pass-through window/grill 11. Furnish and install new doors, frames, and hardware 12. Provide new UFAS compliant casework and countertop as noted 13. Patch and repair existing walls, ceilings, and floors to match existing as necessary 14. Repaint all interior walls, ceilings, doors, frames, base, and trim 15. Existing HVAC to remain, no change 16. Existing water heater to remain, no change

Bid Results

Multi-Residential

$120,913.00

Public - City

Renovation

15

25

4

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Masonry Grouting, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Automatic Entrances, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Canopies, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Facility Storm Drainage, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Duct Silencers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
99
Bidding Soon
1,666
All Active Projects
799
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2023

February 2, 2024

img_map_placeholder

2811 Gamma Dr, Orlando, FL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

UFAS/Accessible Office Renovations for Omega Apts

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.