BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a municipal facility in New Braunfels, Texas. Completed plans call for the construction of a 20,000-square-foot municipal facility.

New Braunfels Utilities ("NBU") is soliciting Request for Proposal ("RFP") for construction manager at risk services for construction of a new headquarters for New Braunfels Utilities. Question Deadline 11/27/2023 at 2:00 PM CT Questions regarding this RFP or the Project must be submitted in writing through the online website or emailed to purchasing@nbutexas.com. Bid Opening: Respondents may also participate in the video conference by telephone at + 1(213)-463-4500. The access code for the telephone is 890201431, then password 9936763794. The design will include development of the entire site and multiple buildings, including up to a 200,000 square foot office building intended to house up to 800 full-time employees; a 20,000 square foot climate-controlled warehouse facility with a dock area for fleet vehicle access and separate access for vendor delivery; a 30,000 square foot equipment building; and a 20,000 square foot vehicle maintenance facility with vehicle lift capability, fluids distribution, overhead lift capabilities, and exhaust evacuation capabilities. The design will include surface parking for approximately 880 vehicles distributed throughout the site for visitor and contractor parking, employee parking, fleet parking, and short-term parking for deliveries. The site selected for the new campus is a 76-acre tract located in west New Braunfels between FM 482 and I-35 South at Engel Road. The site is primarily brush with some significant trees but primarily consists of mesquite and huisache scrub trees. Primary access to the site will be from the I-35 South access road with secondary access from FM 482. NBU desires that the campus utilize the natural site features to organize the design of the campus. NBU desires that the design and construction of the facility emphasize responsible stewardship of resources including water and energy resources. The Project will utilize strategies to manage stormwater discharge, reduce domestic water consumption, and reduce energy consumption that demonstrates NBU's commitment to be a leader in exceeding minimum requirements of the resources it manages

Post-Bid

Municipal

$350,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
29
Bidding Soon
2,335
All Active Projects
905
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

March 1, 2025

img_map_placeholder

5467 FM482, New Braunfels, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.