BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Cortez, Colorado. Contact the soliciting agency for additional information.

CORTEZ SEAT BASE RETARDANT TANK CLEANOUT This solicitation amendment, 005, is to answer additional questions that were received. Please see the attached question and answer document. The new questions and answers are in purple. Please be sure to sign and include any solicitation amendments in your quote package. This is a combined synopsis/solicitation for removal and disposal in accordance with local, state, and federal regulations. Cleanout of 8000-gallon capacity metal tank of fireretardant liquid concentrate remainder/sludge. Estimating 500-1000 gallons of sludge in bottom of tank plus additional water needed for removal/cleanout. Cleanout of 3 poly tanks (3000-gallon capacity each) with residual mixed fire retardant. Two (2) tanks contain estimated 50 gallons each of dried/solidified mixed retardant, 1 tank contains estimated 50 gallons of sludge. Place of Performance: Cortez Municipal Airport, 22874 CR F, Cortez, CO Basic Contracting Requirements: 1. Active Registration: www.sam.gov/SAM 2. Compliance with Section 889 clauses. 3. Invoicing and Payment: www.ipp.gov - 30 day prompt pay after delivery with Progress payments allowed for completion of at least one tank. 4. FAR Part 12 - Commercial Items Provisions and Clauses 5. FAR Part 13 - Simplified Acquisition Procedures 6. Small Business Set-Aside for NAICS 562211 - Hazardous Waste Treatment and Disposal- Size Standard: $47M 7. Type of Contract: Firm Fixed Price. 8. Award of this contract will be on a Low Price Technically Acceptable (LPTA) basis looking at the following factors. a. Technical Response: Include a description of your technical approach, safety plan, certificates and qualifications, expected timeframe to complete the project, equipment, supervision and personnel. Include a description of experience in performing jobs of similar scope. A proposal will be considered technically acceptable if the vendor shows they have recent and relevant experience with similar types of projects, proper equipment, necessary personnel, certificates and qualifications, resources and equipment and ability to safely and effectively complete the project within the allotted timeframe. Technical factors will be assessed as acceptable or non-acceptable. b. Price: Among the technical responses assessed as acceptable, the award will be made to the lowest price. Instructions to Offerors: - Check your SAM registration, this must be current at the time you make your offer. - Please email or call with any questions you have, prior to the closing date, with enough time to research an answer. - Email your signed quote package to: kspetter@blm.gov, with "140L1724Q0001-Canon City Retardant Tank Cleanout" in the subject line, no later than the closing date. Include your Unique Entity Identifier (UEI) which replaced the DUNS number on your quote. - You may put your prices on the SF-18 form itself. - Include enough description/information in order to determine technical acceptability.

Post-Bid

Transportation Terminals

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
5
Bidding Soon
67
All Active Projects
28
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2023

December 6, 2023

img_map_placeholder

Airport Rd,, Cortez, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.