BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Garden City, Kansas. Contact the soliciting agency for additional information.

The City of Garden City, Kansas (CITY) seeks competitive sealed bids for right-of-way clearing. The CITY desires to engage a licensed private tree trimming contractor to perform electrical distribution line clearing and tree removal typical to electric distribution lines and other vegetation away from electric distribution lines. The CITY prefers to work with only one contractor for all tree trimming activity; however, the contractor must show exclusion for work they cannot perform. Solid Waste, Alley (Department Determination) o 2024 - 21 Miles o 2025 - 21 Miles o 2026 - 21 Miles o Electric Distribution Lines (Attachment A) o 2024- 18.6 Miles o 2025-37.3 Miles o 2026-55.5 Miles o Parks and Recreation (Department Determination) o 2024-$14,000 o 2025 -$14,000 o 2026 -$14,000 No bid may be withdrawn sixty (60) calendar days after the bid opening. The City of Garden City reserves the right to evaluate bids to determine the lowest responsible bidder according to City policies, to reject any and all proposals, to waive formalities within the scope of authority, and further, the City reserves the right to make an award of the bid that is in the best interest of the City Direct all questions on the bidding procedure to Kent Pottorf, Electric Operations Manager Kent.Pottorf@gardencityks.us 140 Harvest St. P.O. Box 998 Garden City, KS 67846 (620) 276-1290 Contractor obligations:To supply the labor and equipment specified as necessary to provide forces capable of independently performing tree trimming along power lines and other right-or-ways belonging to the CITY. The Contractor must submit the proper ACRT Arborist Training certification to work around live energized power lines up to and including 35,000 volts, and all Contractor personnel must attend training awareness of the hazards associated with live energized power lines work at the Utility Service Center. All tree trimming work is to be accomplished in accordance with the directions of the designated representative of the CITY. Clearing of Wood Waste: It shall be the financial and physical responsibility of the contractor to dispose of all wood and wood products resulting from the pruning and removal process. The CITY shall supply a location to dispose of inert, clean wood waste or chippings. Clearing Distance: All distribution lines right-of-way must be cleared to a minimum of ten feet (1 O') from any energized conductor above fifteen (15) feet. Only side and top pruning are permitted with a minimum clearance of ten feet (10') from the energized conductors. All overhanging limbs must be removed unless there are special unsafe conditions that would prevent removal. The final decision concerning leaving overhanging limbs will rest solely with the CITY. Additional tree trimming in alleys and public rights-of-way from ground level to 15 feet high to allow for Solid Waste Utility vehicle access. . Trim specified areas for Parks and Recreation as outlined in the attachment.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
6
Bidding Soon
30
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2023

January 8, 2024

img_map_placeholder

Multiple Locations, Garden City, KS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.