BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Fort Wayne, Indiana. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Bidder shall furnish all labor, insurance, equipment, materials and power for the complete performance of this project as follows: This project will include widening Ardmore Avenue 12' to facilitate a left turn lane at Sand Point Road. The turning movement will be for southbound traffic on Ardmore turning eastbound onto Sand Point. New curbs, drive approaches and pavement striping along with minor stormwater improvements by way of linear ditch grading, drive culverts and curb turnouts are included as well. all in accordance with the Bidding Documents and Drawing No. ST- 0526A as prepared by Transportation Engineering for the City of Fort Wayne, Indiana. No bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City, upon any debt or contract, or who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City. No bid may be withdrawn after the scheduled time for receipt of bids for at least ninety (90) days to allow review of bids before announcing award of contract. The successful bidder may be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Ezra Broman may be reached by telephone at (260) 427-2777 or through email at ezra.broman@cityoffortwayne.org. The engineers estimate for this project is $890,645.00

Award

Roads / Highways

$569,051.00

Public - City

Paving, Site Work

24

28

16

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
16
Bidding Soon
585
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

December 18, 2023

img_map_placeholder

Ardmore Ave, Fort Wayne, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.