Site work for a road / highway in Alden, Illinois. Working plans call for site work for a road / highway.

As of July 10, 2025, per owner, the 2024 Intersection Safety Project, including the Alden/O’Brian intersection is still in the Phase I stage. They need to complete the Phase I, then continue onto Phase II the design phase – before they go out to bid to award to a contractor – they are likely at least 2 or 3 years out. Design team is still to be determined, short list identified. Scope of work Each location will have a separate Project Development Report and will be processed independently through IDOT. Anticipated Work Items may include, but are not limited to the following Perform necessary survey work Perform drainage, floodplain, and wetland studies Prepare crash analysis & design traffic data Prepare all necessary reports, including Location Drainage Study Wetland Report Geotechnical Report Prepare Intersection Design Study Perform Lighting Analysis Alternatives Analysis Report Traffic Management Analysis Complete a Project Development Report McHenry County Division of Transportation desires to contract with a qualified engineering firm to assist the County of McHenry in developing Phase I Preliminary Engineering with an option for Phase II Design Engineering for safety improvements at three (3) intersections located in McHenry County. The intersections are Spring Grove Road at Miller Road, Alden Road at O Brien Road, and Maple Street at Coral Road. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. Vendor Questions Submitted via E-Mail Due No Later than November 08, 2023 4:00PM CST Vendor Questions Answered via Addendum posted no later than November 14, 2023 4:00PM CST Project Starts (Anticipated) March 25, 2024 County Board Approval of Selected Consultant (Anticipated) March 19, 2024 The method of Contractor Selection has not been Determined at this time.

Final Planning

Roads / Highways

$3,000,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
505
Active Projects
263
Bidding Soon
3,734
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2029

Project location map

O'Brien Rd & Alden Rd, Alden, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.