Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 10, 2025 at 8:00 PM
Updated July 11, 2025
Site work for a road / highway in Alden, Illinois. Working plans call for site work for a road / highway.
As of July 10, 2025, per owner, the 2024 Intersection Safety Project, including the Alden/O’Brian intersection is still in the Phase I stage. They need to complete the Phase I, then continue onto Phase II the design phase – before they go out to bid to award to a contractor – they are likely at least 2 or 3 years out. Design team is still to be determined, short list identified. Scope of work Each location will have a separate Project Development Report and will be processed independently through IDOT. Anticipated Work Items may include, but are not limited to the following Perform necessary survey work Perform drainage, floodplain, and wetland studies Prepare crash analysis & design traffic data Prepare all necessary reports, including Location Drainage Study Wetland Report Geotechnical Report Prepare Intersection Design Study Perform Lighting Analysis Alternatives Analysis Report Traffic Management Analysis Complete a Project Development Report McHenry County Division of Transportation desires to contract with a qualified engineering firm to assist the County of McHenry in developing Phase I Preliminary Engineering with an option for Phase II Design Engineering for safety improvements at three (3) intersections located in McHenry County. The intersections are Spring Grove Road at Miller Road, Alden Road at O Brien Road, and Maple Street at Coral Road. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. Vendor Questions Submitted via E-Mail Due No Later than November 08, 2023 4:00PM CST Vendor Questions Answered via Addendum posted no later than November 14, 2023 4:00PM CST Project Starts (Anticipated) March 25, 2024 County Board Approval of Selected Consultant (Anticipated) March 19, 2024 The method of Contractor Selection has not been Determined at this time.
Final Planning
Roads / Highways
$3,000,000.00
Public - County
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2029
O'Brien Rd & Alden Rd, Alden, IL
Related To This Project
Alden, IL
Bid Date: Mar 05 2025
Alden, IL
Bid Date: Mar 09 2022
Alden, IL
--
Naperville, IL
Bid Date: Nov 07 2023
St Charles, IL
Bid Date: Jan 11 2024
Huntley, IL
Bid Date: Nov 28 2023
Leonore, IL
Bid Date: Dec 20 2023
Evanston, IL
Bid Date: Nov 07 2023
Hillsboro, IL
--
Carbondale, IL
Bid Date: Nov 28 2023
Edwardsville, IL
Bid Date: Nov 07 2023
Moline, IL
Bid Date: Nov 16 2023
Batavia, IL
Bid Date: Jan 12 2024
Galesburg, IL
Bid Date: Nov 22 2023
Old Mill Creek, IL
Bid Date: Jan 04 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
