BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Aurora, Colorado. Completed plans call for site work for a sidewalk / parking lot.

Inquiry Period: Written questions from prospective bidders are to be received in the procurement portal.:November 1, 2023, 3:00pm RTD has specified a SBE participation goal of 20% for the Work to be performed under the Contract. Bidders must make adequate good faith efforts to meet this goal in order to be deemed as a responsive and responsible bidder. Award of the Contract will be conditioned on meeting the requirements of this section. 49 CFR Part 26.53 and Appendix A of 49 CFR Part 26 shall serve as the criteria for evaluating compliance with the good faith efforts requirements. Additionally, bidders are required to solicit the support and assistance of RTD's Small Business Office if they are unable to meet the SBE participation goal assigned to this Contract. The bidders can meet this requirement in one of two ways: First, the bidder can meet this goal by demonstrating and documenting its commitments for participation by SBEs for at least the total percentage identified above or a percentage that exceeds the goal for the project. The SBE Contract Requirements as well as 49 CFR Part 26.53 explain the procedures that recipients/agencies such as RTD should follow in this situation. For purposes of this section, RTD will accept SBEs that are currently certified with the RTD Small Business Office as well as MWBEs/SBEs and DBEs that are currently certified with the City and County of Denver and CDOT under the NAICS code that coincides with the Scope of Work that they will execute in this project. All DBEs/SBEs/MWBEs must be certified prior to the bid submission, except in a "design-build" or "turnkey" contracting situation, multi-year projects, or some on-call or work order projects where RTD will explain its procedure in section 3 of the SBE Contract Requirements. Second, if the bidder does not meet the SBE goal identified in this Contract or is able to only meet part of this goal, it must document adequate good faith efforts. Appendix A to 49 CFR part 26 clearly states, "This means that the bidder must show that it took all necessary and reasonable steps to achieve a SBE goal or other requirement of this part which, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to obtain sufficient SBE participation, even if they were not fully successful." Additionally, SBE Contract Requirements as well as 49 CFR Part 26.53 explain the good faith efforts procedures that recipients/agencies such as RTD should follow when a bidder does not meet the goal. The SBE participation goal applies to the total value of the Contract including all pre-award negotiation results and post-award change orders/modifications. Submittals of the bidder's SBE Plan/Program will be evaluated based on the bidder's SBE approach, creativity, demonstrated commitment to RTD's SBE and diversity programs, ability to successfully respond to project SBE participation goals and compliance with overall DBE program requirements as codified in 49 CFR Part 26 and RTD's SBE Program.

Award

Sidewalks / Parking Lot

$2,449,529.00

Public - State/Provincial

Site Work

30

14

68

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
113
Bidding Soon
1,672
All Active Projects
715
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.