BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Palo Alto, California. Conceptual plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; water / sewer project; and water / sewer project.

he City of Palo Alto owns and maintains two welded steel, potable water storage tanks called "Park Reservoir" and "Dahl Reservoir", located in the Palo Alto foothills area Page Mill Road. The Tanks are 59 years old and require seismic retrofits, roof replacement, new coating, modifications to vents, and other assorted improvements and repairs. The Water, Gas, and Wastewater Engineering Group (WGW) of the Utility Department of the City of Palo Alto prepared this Scope of Work ("SOW") for a qualified engineering consulting firm ("Consultant") to perform an all-comprehensive engineering and structural inspection and condition assessment of Dahl Tank and to prepare engineering alternatives, plans, and specifications for both Dahl and Park Reservoirs. In 2010, the City of Palo Alto entered into an agreement with URS/AECOM for engineering assessment, design, and construction management of seismic improvements for six (6) of the City's potable water storage reservoirs; the engineering work included Dahl and Park Reservoir. Geotechnical engineering, structural engineering, corrosion assessments, and full construction plans and specifications for a seismic retrofit and rehabilitation of the tanks were completed by February 2015, but the improvements were not constructed, due to unforeseen construction costs. The engineering and design work and assessments previously completed will be available to the Consultant to revise, update, and incorporate into this scope of work. WGW Staff assessed the need for a revision and an update to the previously completed construction plans for the following reasons. Question Submission Deadline: December 6, 2023, 1:00pm Question Response Deadline: December 11, 2023, 1:00pm

Conceptual

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
78
Bidding Soon
1,534
All Active Projects
580
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

img_map_placeholder

Multiple Locations, Palo Alto, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.