BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a sidewalk / parking lot in Miami, Florida. Conceptual plans call for site work for a sidewalk / parking lot.

Project Threshold : Project is less than $500,000.00 (Technical Qualification only) District : 06 Selection Method : Letter of Response and Abbreviated Technical Proposal Project Description : SR 944/NW 54th Street from NW 32nd Avenue to NW 12th Avenue Plain Language Description : Project Objective: To perform improvements associated with pedestrian/bicycle safety. Pedestrian crashes RRFB on NW 54 Street between NW 19 Avenue and NW 18 Avenue. Install a midblock pedestrian crossing controlled with RRFB on NW 54th Street between NW 13 Avenue and NW 12 Avenue. Install pedestrian poles closer to pedestrian ramps. Provide scope: install a midblock pedestrian crossing controlled w/ high emphasis pavement markings and pedestrian signage. Location #2: SR 944/NW 54 St from NW 32 Ave to NW 29 Ave b/c: 6.9/NPV: $2,513,423/SHSP: pedestrian crashes scope: provide midblock pedestrian crossing on NW 54th Street between NW 30 Court and NW 30 Avenue controlled with an RRFB. Realign the crosswalk at NW 31 Avenue midblock crossing. Install pedestrian poles closer to pedestrian ramps. Provide high emphasis pavement markings & ped signage location #3: SR 944/NW 54 St at NW 22 Ave b/c: 11.6/NPV: $4,014,008/SHSP: intersection crashes - safe stride 2 zero (ss2z) scope: provide protected only left turn operation for northbound approach. Install flexible backplates. Provide protected only left turn operation for southbound approach. Exception from bmp 2.340 to 2.950. Contract Amount/Limit : $425,461.00 Advertisement Date 11/07/2023 Response Deadline Date/Time 11/21/2023 03:30 am Longlist Date/Time 12/05/2023 08:30 pm Shortlist Selection Date/Time 12/11/2023 08:30 pm Phase II Submittal Deadline Date/Time 1/04/2024 01:30 am Final Selection Date/Time 1/22/2024 08:30 pm Negotiations Period Begin Date 1/30/2024 Negotiations Period Ending Date 3/30/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 944/NW 54th Street from NW 32nd Avenue to NW 12th Avenue

Conceptual

Sidewalks / Parking Lot

$425,461.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
42
Bidding Soon
1,076
All Active Projects
473
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.