Site work for a civil project in Santa Nella, California. Completed plans call for site work for a water / sewer project.

The Project construction schedule is anticipated to be 365 days. The construction cost for the Project is estimated to be up to $11.2 million. The Project consists of water quality improvements to the existing District water system, including improvements at the existing District distribution site to add pumps and storage to blend treated surface water and groundwater from the existing Well No. 1 and production Well No. 2, drilled in July 2023 as the first phase of this Project. The Project includes construction of a water transmission pipeline from the Well No. 2 site located near the community of Volta that includes bore and jack crossings at the Central California Irrigation District (CCID) Main Canal and Outside Canal and across Henry Miller Road near the Well No. 1 site. The District has obtained license agreements with CCID for the infrastructure improvements at the Main Canal and Outside Canal crossings. The Project also includes improvements to consolidate the existing Volta community. The consolidation includes supplying existing Volta customers with water from Well No. 2. Water meters will be installed on existing residential and commercial service laterals. The existing Volta well will be destroyed and associated well site facilities will be removed as part of this Project. Base Bid items for the Project will include the following: distribution site improvements, including blending pumps, a blending station building, low pressure pumps, a low pressure pump station building, two (2) 750,000 gallon storage tanks, a hydropneumatics tank, an on-site generator, site grading and piping, concrete equipment pads/foundations, and upgrades to the existing electrical and SCADA controls; approximately 5-miles of 8-inch diameter water transmission main from the new Well No. 2 site with a connection to the existing transmission pipeline near the existing Well No. 1 site; Well No. 2 site improvements, including installation of a well pump, topside well discharge piping and pedestal, chlorination facilities, one (1) 200,000-gallon welded steel storage tank, booster pump station building, hydropneumatics tank, and approximately 0.5 miles of distribution pipeline from the Well No. 2 site with a connection to the existing Volta water distribution system, an on-site generator, site grading, drainage, piping, lighting, concrete equipment pads/foundations, power supply, and electrical and SCADA controls. Appendix A includes a location map and project site maps from the 90-percent progress design documents. Prospective bidders shall be licensed Contractors in the State of California and shall be skilled and regularly engaged in the general class or type of work called for under the Contract. Each prospective bidder shall have a Class A California Contractor's license. Subcontractors will not be required to pre-qualify for this project. Questions regarding the pre-qualification application shall be submitted in writing directly to Patrick Scott, EIT, with Black Water Consulting Engineers, Inc. at patrick@blackwater-eng.com. Contractors who submit a complete pre-qualification package will be notified of their qualification status no later than ten (10) working days after submission of the information. Disadvantaged Business Enterprise Requirements, American Iron and Steel (AIS) Compliance, and Davis-Bacon Wage Rate Compliance SNCWD reserves the right to waive minor irregularities and omissions in the information contained in the pre-qualification application submitted, to make all final determinations, and to determine at any time that the pre-qualification procedures will not be applied to a specific future public works project

Post-Bid

Water / Sewer

$11,200,000.00

Public - City

Site Work

8

5

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
65
Bidding Soon
1,289
All Active Projects
564
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2024

March 25, 2024

img_map_placeholder

Multiple Locations, Santa Nella, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.