BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a power facility in Swift Current, Saskatchewan. Completed plans call for site work for a power facility.

SaskPower is seeking sustainment construction services required to maintain acceptable reliability to the C1S 230kV transmission line, which runs between the Coteau Creek and Swift Current Stations. The scope of work includes spar arm and cross brace replacements on approximately 150kms of transmission line or 454 structures. The C1S - 230kV transmission line will be divided into two (2) separate Work Packages as generally described below. Please see the attached "C1S Scope WP#1 & WP#2" excel document for full Project summary. WP#1 - Swift Current Substation (STR #3 to STR#288), 226 Structures; WP#2 - STR# 289 to Coteau Creek Substation (STR#573), 228 Structures. The Work generally includes: - the replacement of spar arms and cross braces "like for like" with wood on D17-001 & D17-002 structures, spar replacements on D17-005, D17-006, D17-007 and D17-009 structure series; - existing conductor shall be transferred (new conductor stringing not required), existing shield wire shall be transferred (new shield wire stringing not required); - conductor and shield wire dampers shall be replaced or added on all in scope structures; - all work shall be completed in an energized state with short outages possibly available upon request and coordination. Question Acceptance Deadline: 2023/11/30 03:00:00 PM CST Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform

Post-Bid

Power Plant

$500,000.00

Public - State/Provincial

Site Work

26

6

46

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
5
All Active Projects
1
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2023

January 4, 2024

img_map_placeholder

Multiple Locations, Swift Current, SK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.