Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 19, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Wellston, Ohio. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Bridge replacement of the existing single span steel bridge with timber deck with an asphalt wearing surface, supported on stone abutments with reinforced concrete cap and spread footings. The proposed structure will be a single span prestressed composite boxbeam bridge on existing abutments with minimal roadway improvement work. Proposals must contain the name of every person interested therein and shall be accompanied by a Bid Guaranty and Contract Bond for the full amount of bid; or in lieu of the bid guaranty and contract bond the bidder may submit a bid guaranty as provided by Section 153.54 of the Ohio Revised Code in the form of a certified check or cashier's check. The amount of the certified check or cashier's check shall be equal to ten percent (10%) of the bid. The certified check or cashier's check submitted with a bid will be held as a guarantee on an accepted bid proposal. Bidders Are Required to Be Pre-qualified With the Ohio Department of Transportation To Submit a Bid for This Project The EDGE Goal for this bridge project = 5% The contract will be awarded within 30 days of the bid opening date. At that time, a bid guaranty and contract bond in the sum of 100% of the bid plus all added alternates shall be executed in accordance with Section 307.89 of the Revised Code of Ohio. The JAC-CR39 (Mulga Road)-3.06 bridge work can begin no sooner than February 1, 2024 and shall be completed no later than May 31, 2024. Upon failure to complete the work within the time specified, the Contractor shall be governed in accordance with Section 5555.67 of the Revised Code of Ohio. No proposal shall be considered unless it complies with all the rules and regulations set forth in the Contract documents. All bidders are urged to carefully read the same and comply with them. The Board of County Commissioners reserves the right to reject any or all bids.

Bid Results

Bridges / Tunnels

$364,188.00

Public - County

Paving, Site Work

15

7

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
99
Bidding Soon
1,765
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2023

February 1, 2024

Project location map

Mulga Rd, Wellston, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed