BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Laguna Niguel, California. Completed plans call for the renovation of a clubhouse / community center.

A. Check all drains to ensure that they are free flowing and plumbing underneath drain is not leaking prior to starting roofing work. 1. Any clogged or leaking drains are to be noted and documented with the City. The Contractor to provide a cost to clear any clogged drain lines prior to starting roof restoration. 2. All drains that are clogged at end of the project that were not documented will be roofing contractors' responsibility to clean/repair. B. Remove and dispose of all roofing walk pads and repair the roof area underneath existing walk pads, as needed. C. Pressure wash roofing membrane and allow it to dry. Properly dispose of all debris. D. Number, remove and set aside all counter flashings before the roof restoration is started. Reinstall existing counterflashing back in place once roof restoration is completed. Seal all corners and joints with caulking. E. Penetrations, vents, exhaust fans and curb corners to be sealed with white silicone sealer - Cool-Sil FG Flashing. Seal as needed with silicone sealant - All-Sil. F. Repair damaged cap sheet. 1. Cut open any blisters, splits, or damaged cap sheet. 2. Heat up and scrape off white coating to repair areas prior to torch work. 3. Prime with Garla-Prime VOC and then torch-apply new SBS-modified mineral cap sheet - StressPly IV Plus Mineral - over the area. G. Remove and dispose of the equipment steel site screen cover and embeds located around the HVAC units. Heat up and scrape off white coating to repair areas prior to torch work. Patch roof with new torch applied SBS Modified mineral cap sheet - StressPly IV Plus Mineral. H. Remove and dispose of the equipment steel site screen cover embeds located around the HVAC units. Heat up and scrape off white coating to repair areas prior to torch work. Patch roof with new torch applied SBS Modified mineral cap sheet - StressPly IV Plus Mineral. I. Install asphalt stain blocking primer - Cool-Sil Bleed Blocker Primer - at 1 gal per sq to the roof. J. Reinforce all seams and details with 6" wide UniBond ST tape. K. Install white silicone restoration coating - Cool-Sil HB -in an area of 16 square feet in each drain area at 3.0 gallons per 100 square ft. and immediately embed polyester into the coating while wet. Remove drain rings prior to installation of polyester and reinstall at the end of all coating work. L. Install white silicone restoration coating - Cool-Sil SG - at 2.0 gallons per 100 square ft. over the entire roof field surface (including penetrations). M. Install white silicone restoration coating - Cool-Sil SG - at 1.5 gallons per 100 square ft. over the entire roof field surface (including penetrations), immediately broadcast 30lbs per square of T24 minerals (20-40 mesh silica sand) into wet coating while wet and immediately back roll to set. N. Replace all conduit and pipe blocking with new rubberized blocking. O. Add Alternate 1: Furnish and install three (3) new OSHA approved galvanized ladders to go up and over parapet walls at the locations noted on site map. Each Bid shall be accompanied by cash, a certified or cashier's check payable to the City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as principal and an admitted surety insurer as Surety, in an amount not less than ten percent (10%) of the amount set forth in the Bid. Project Duration : 45 Working Days Liquidated Damages : $300 Per Day Contractor is required to pay general prevailing wages, as defined in Subchapter 3, Title 8 of the California Code of Regulations and Section 16000 et seq. and Section 1773.1 of the California Labor Code. Pursuant to the provisions of Section 1773 of the California Labor Code, the City Council has obtained the general prevailing rate of per diem wages and the general rate for holiday and overtime work in this locality for each craft, classification, or type of worker needed to execute the contract for this Project from the Director of the Department of Industrial Relations ("DIR"). Copies of these rates may be obtained at the Purchasing Division's office of the City of Palo Alto. Contractor shall provide a copy of prevailing wage rates to any staff or subcontractor hired and shall pay the adopted prevailing wage rates as a minimum. Contractor shall comply with the provisions of all sections, including, but not limited to, Sections 1775, 1776, 1777.5, 1782, 1810, and 1813, of the Labor Code pertaining to prevailing wages The City reserves the right to reject any or all Bids or any parts thereof or to waive any irregularities or informalities in any Bid or in the bidding. The Contract award, if made, will be to the lowest responsible, responsive Bidder and is anticipated to occur within ninety (90) Days after the Bid opening. The Contract award may be made after that period if the selected Bidder has not given the City written notice of the withdrawal of its Bid. Pre-Bid Questions and requests for clarifications must be submitted to the City by 5:00 P.M. November 02, 2023.

Bid Results

Clubhouse / Community Centers

$134,480.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
571
Active Projects
280
Bidding Soon
4,082
All Active Projects
1,804
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 9, 2023

December 4, 2023

February 5, 2024

img_map_placeholder

24602 Aliso Creek Rd, Laguna Niguel, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.