Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 18, 2024 at 8:00 PM
Updated June 19, 2024
Site work for a water / sewer project in Fremont, Nebraska. Completed plans call for site work for a water / sewer project.
***Apparent low bidder from previous bid opening: K2 Construction - $1,100,000 Fremont Lakes Pathfinder Sewer Improvements LOCATION: Fremont Lakes SRA Scope of Work: The Work in this Project is Demolition of an existing shower house and site preparation for a new Owner-purchased, contractor-installed shower house, construction of an access drive with two RV Dump Stations and two RV fill stations, installation of two low pressure sewer pumping stations and associated force mains, connections to existing utilities, and other Work indicated in the Contract Documents. bidder's proposal shall be submitted on a form supplied with the Bidding Documents and must be accompanied by a certified check, cashier's check, or Bid Bond in the amount of 5% of the total Bid, made payable to the Nebraska Game and Parks Commission as Bid security. Bid security shall be considered as liquidated damages and forfeited to the Nebraska Game and Parks Commission if the Bidder's proposal is accepted and the Bidder fails to execute the contract and provide the required bond(s) and insurance specified. No Bid Bond will be required if the total project cost is less than $50,000.00. A Contractor is Required to Furnish a Labor and Material Payment Bond in The Full Amount of the Contract Price if at the Time of the Contract Award the Total Project Cost Exceeds $15,000. In Accordance With Neb. Rev. Stat. 72-803 (3), the Successful Bidder is Required to Furnish a Performance Bond in the Full Amount of the Contract Sum at the Time of Contract Award if the Total Project Cost Exceeds $50,000. No Performance Bond Will Be Required if the Independent Contractor is Willing to Take a Single Lump-sum Payment Once All Work Has Been Completed and Accepted by the Engineering Division of the Nebraska Game and Parks Commission Unless the Total Project Cost Exceeds $100,000 at the Time of Contract Award. The Nebraska Game and Parks Commission reserve the right to accept or reject any or all Bids and to waive any or all informalities or irregularities.
Award
Water / Sewer
$720,403.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2024
July 22, 2024
4349 W State Lks Rd, Fremont, NE
Related To This Project
Fremont, NE
Bid Date: Nov 29 2023
Fremont, NE
Bid Date: Nov 29 2023
Fremont, NE
--
Fremont, NE
Bid Date: May 18 2020
Fremont, NE
Bid Date: Dec 19 2023
Fremont, NE
Bid Date: Dec 21 2023
Fremont, NE
Bid Date: Jan 26 2024
Fremont, NE
Bid Date: Feb 13 2024
Fremont, NE
--
Fremont, NE
Bid Date: Dec 01 2023
Fremont, NE
Bid Date: Dec 06 2023
Fremont, NE
Bid Date: Nov 28 2023
Fremont, NE
Bid Date: Nov 15 2023
Fremont, NE
Bid Date: Sep 19 2023
Fremont, NE
Bid Date: Apr 28 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed