BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2024 at 7:00 PM

Updated January 27, 2024

Site work and paving for a road / highway in Carthage, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed work includes: Replacement of existing signalized intersection at outer road and southbound ramp terminal intersection with a roundabout for Route HH (Fir Road), Dr. Russell Smith Way (outer road) and I 49 southbound ramps. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. Each Bidder must deposit with his/her bid, security in the amount of five percent (5%) of his/her base bid which is subject to conditions provided in the Instructions to Bidders The DBE Goal for this project is 6 %. No Bidder may withdraw his bid within thirty (30) consecutive calendar days after the actual date of the opening thereof. All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Sean Matlock, P.E., Project Manager OWN, Inc. 2232 S. Garrison Ave. Carthage, MO 64836 Telephone Number 417-358-9551 Email smatlock@weareown.com

Award

Roads / Highways

$2,659,341.00

Public - City

Paving, Site Work

224

12

4

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
45
Bidding Soon
652
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

December 29, 2023

Project location map

W Fir Rd & Dr Russell Smith Way, Carthage, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.