Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Kodak, Tennessee. Completed plans call for site work for a playground / park / athletic field.
This request for bids is for a contract to furnish all material, equipment, supplies and labor necessary to insulate work area, pour concrete, repair foundation, and install a French drain. The contractor will need a full BC, BCB or a BC-5, BC-19, BC-16, and BC-21. General Conditions 1) On-Site work shall be performed between contract award and May 15, 2024, unless an exception is granted by the Facilities Management Regional Manager. 2) All work shall comply with state-approved versions of the IBC, standards, regulations, other applicable codes, manufacturer's recommendation, and best practices. Contractor is responsible for all permits and associated fees. 3) Only the Facilities Management Office can approve any alterations, modifications, or substitutions to the written scope, specifications, or requirements of the project. No additional work shall be authorized unless pre-approved by the Facilities Management Office. 4) Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner. 5) All color selections shall be determined by the Park or Hospitality Manager and approved by the Facilities Management Office. 6) All material substitutions must be pre-approved by Facilities Management Office. 7) All materials shall be installed per manufacturer's recommendation and best practice. 8) Contractor is responsible for verifying actual dimensions prior to ordering any materials or bidding. No allowances shall be made due to any bidder neglecting to visit the site and verifying dimensions and conditions. General Specifications 1) The contractor shall stabilize and repair the foundation damage on right rear of structure. 2) The contractor shall replace siding on right rear of structure with like materials. 3) The contractor shall remove soil in the bays on the right side of the barn to facilitate the addition of at least 3-inches of gravel, welded concrete mesh and 4-inches concrete in each bay. Park Staff shall remove contents of each bay before construction begins. 4) The contractor shall insulate the workroom with closed cell spray foam. The exposed insulation for the walls should be covered with boards to match the existing structure. 5) The contractor shall create a French drain system between the structure and the hillside on the left side. It should be covered with gravel to soil level, and empty into a catch basin behind the gravel lot. Additional Conditions: This is a turnkey job. All aspects of this job shall be left in a finished condition: All finish work, interior and exterior walls and trim, finish painting, caulking and final cleanup are included in this contract. All bidders are advised to visit site to verify all conditions and dimensions. No allowances shall be made by the agency due to any bidder neglecting to visit the site and verifying dimensions and conditions. All bids over $100,000 shall include provisions for a payment bond in the amount of twenty-five percent (25%) of the contract price. Contractor shall be responsible for determining where all utilities are on the job site and care should be taken to protect the utilities from any damage caused by the demo/construction. This shall include any underground utilities around the job site area. If damage occurs, it shall be repaired within a 24-hour period from the time damage occurs. Contractor shall perform work on regular time and shall invoice work time and material not to exceed the quoted price. Any variance in quote shall be addressed with a representative of Facilities Management, East TN Regional Office (ETRO) before additional work or materials are supplied. Work shall be scheduled to avoid any interference with normal operation of the park as much as possible. During the construction period, coordinate construction schedules and operations with the agency. Work shall be conducted during the normal business hours of Monday through Friday, 8:00 a.m. to 4:30 p.m., unless approval for an alternate schedule is arranged with Facilities Management. Successful contractor shall schedule and attend a pre-construction conference where a preconstruction form shall be signed by Facilities Management, Contractor and Park Manager or park representative before work can begin. Contractor shall also schedule and attend a final inspection where a final inspection form shall be signed by Facilities Management, Contractor and Park Manager or park representative before invoice shall be paid. The contractor shall protect areas adjacent to his work and shall be required to repair any damage he may cause. Contractor shall protect work of other trades. Contractor shall correct any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by Facilities Management. Workmanship is to be warranted for not less than one year from date of final inspection. Materials shall be warranted as per manufacturer warranty. All materials, equipment, and supplies shall be new and in good condition, UL listed when applicable, and all work accomplished in a manner acceptable to Facilities Management. Submittals shall be required on all materials and shall be presented for approval by the State of Tennessee representative: Facilities Surveyor, Facilities Manager or Park Manager. Clean up of the project site shall be the responsibility of the contractor. Contractor shall assure that job site is clean of nails, debris, etc., at end of each day to ensure safety. Contractor shall clean up and haul away all scrap when work is completed to an approved location off state property. Contractor, employees, or sub-contractors shall be licensed, certified, or registered as required. They shall be registered in the State of Tennessee Edison purchasing system. The contractor shall have a Certificate of Insurance on file with Facilities Management. The State of Tennessee shall not be held liable for any damage, loss of property, or injury of personnel resulting from actions of the contractor and/or his/her sub-contractors or employees. Contractor shall obtain all fees and permits required for project. Contractor shall have a copy of project specifications, permits, and certificate of insurance on project site at all times. Invoice shall be submitted for payment within 10 days of project completion. A copy of the invoice shall be submitted to Facilities Management, East TN Regional Office, 160 State Circle, Rocky Top, TN 37769, or to deborah.g.smith@tn.gov. For scheduling contact: Facilities Manager: Chad Young, 865-606-1551, chad.young@tn.gov Facilities Surveyor: Chris Mayeaux, 865-340-3287, chris.mayeaux@tn.gov Prospective respondents must direct communications concerning this ITB to the following person designated as the Solicitation Coordinator: Shane Gibson Department of General Services, CPO 312 Rosa L Parks Avenue, 3rd Floor Tennessee Tower Nashville TN 37243-1102(615) 253-4762 Shane.Gibson@tn.gov Question Deadline 11/22/2023
Post-Bid
Playgrounds / Parks / Athletic Fields
$6,684,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 28, 2023
January 29, 2024
2809 Kelly Ln, Kodak, TN
Related To This Project
Kodak, TN
Bid Date: Jan 09 2024
Kodak, TN
Bid Date: Jul 12 2024
Kodak, TN
Bid Date: Aug 09 2024
Kodak, TN
--
Kodak, TN
--
Kodak, TN
--
Kodak, TN
Bid Date: Jul 31 2024
Kodak, TN
--
Kodak, TN
--
Kodak, TN
Bid Date: Aug 18 2023
Kodak, TN
Bid Date: Aug 07 2023
Kodak, TN
Bid Date: Jan 06 2022
Kodak, TN
--
Kodak, TN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.