BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Kodak, Tennessee. Completed plans call for site work for a playground / park / athletic field.

This request for bids is for a contract to furnish all material, equipment, supplies and labor necessary to insulate work area, pour concrete, repair foundation, and install a French drain. The contractor will need a full BC, BCB or a BC-5, BC-19, BC-16, and BC-21. General Conditions 1) On-Site work shall be performed between contract award and May 15, 2024, unless an exception is granted by the Facilities Management Regional Manager. 2) All work shall comply with state-approved versions of the IBC, standards, regulations, other applicable codes, manufacturer's recommendation, and best practices. Contractor is responsible for all permits and associated fees. 3) Only the Facilities Management Office can approve any alterations, modifications, or substitutions to the written scope, specifications, or requirements of the project. No additional work shall be authorized unless pre-approved by the Facilities Management Office. 4) Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner. 5) All color selections shall be determined by the Park or Hospitality Manager and approved by the Facilities Management Office. 6) All material substitutions must be pre-approved by Facilities Management Office. 7) All materials shall be installed per manufacturer's recommendation and best practice. 8) Contractor is responsible for verifying actual dimensions prior to ordering any materials or bidding. No allowances shall be made due to any bidder neglecting to visit the site and verifying dimensions and conditions. General Specifications 1) The contractor shall stabilize and repair the foundation damage on right rear of structure. 2) The contractor shall replace siding on right rear of structure with like materials. 3) The contractor shall remove soil in the bays on the right side of the barn to facilitate the addition of at least 3-inches of gravel, welded concrete mesh and 4-inches concrete in each bay. Park Staff shall remove contents of each bay before construction begins. 4) The contractor shall insulate the workroom with closed cell spray foam. The exposed insulation for the walls should be covered with boards to match the existing structure. 5) The contractor shall create a French drain system between the structure and the hillside on the left side. It should be covered with gravel to soil level, and empty into a catch basin behind the gravel lot. Additional Conditions: This is a turnkey job. All aspects of this job shall be left in a finished condition: All finish work, interior and exterior walls and trim, finish painting, caulking and final cleanup are included in this contract. All bidders are advised to visit site to verify all conditions and dimensions. No allowances shall be made by the agency due to any bidder neglecting to visit the site and verifying dimensions and conditions. All bids over $100,000 shall include provisions for a payment bond in the amount of twenty-five percent (25%) of the contract price. Contractor shall be responsible for determining where all utilities are on the job site and care should be taken to protect the utilities from any damage caused by the demo/construction. This shall include any underground utilities around the job site area. If damage occurs, it shall be repaired within a 24-hour period from the time damage occurs. Contractor shall perform work on regular time and shall invoice work time and material not to exceed the quoted price. Any variance in quote shall be addressed with a representative of Facilities Management, East TN Regional Office (ETRO) before additional work or materials are supplied. Work shall be scheduled to avoid any interference with normal operation of the park as much as possible. During the construction period, coordinate construction schedules and operations with the agency. Work shall be conducted during the normal business hours of Monday through Friday, 8:00 a.m. to 4:30 p.m., unless approval for an alternate schedule is arranged with Facilities Management. Successful contractor shall schedule and attend a pre-construction conference where a preconstruction form shall be signed by Facilities Management, Contractor and Park Manager or park representative before work can begin. Contractor shall also schedule and attend a final inspection where a final inspection form shall be signed by Facilities Management, Contractor and Park Manager or park representative before invoice shall be paid. The contractor shall protect areas adjacent to his work and shall be required to repair any damage he may cause. Contractor shall protect work of other trades. Contractor shall correct any painting related damage by cleaning, repairing, or replacing, and refinishing as directed by Facilities Management. Workmanship is to be warranted for not less than one year from date of final inspection. Materials shall be warranted as per manufacturer warranty. All materials, equipment, and supplies shall be new and in good condition, UL listed when applicable, and all work accomplished in a manner acceptable to Facilities Management. Submittals shall be required on all materials and shall be presented for approval by the State of Tennessee representative: Facilities Surveyor, Facilities Manager or Park Manager. Clean up of the project site shall be the responsibility of the contractor. Contractor shall assure that job site is clean of nails, debris, etc., at end of each day to ensure safety. Contractor shall clean up and haul away all scrap when work is completed to an approved location off state property. Contractor, employees, or sub-contractors shall be licensed, certified, or registered as required. They shall be registered in the State of Tennessee Edison purchasing system. The contractor shall have a Certificate of Insurance on file with Facilities Management. The State of Tennessee shall not be held liable for any damage, loss of property, or injury of personnel resulting from actions of the contractor and/or his/her sub-contractors or employees. Contractor shall obtain all fees and permits required for project. Contractor shall have a copy of project specifications, permits, and certificate of insurance on project site at all times. Invoice shall be submitted for payment within 10 days of project completion. A copy of the invoice shall be submitted to Facilities Management, East TN Regional Office, 160 State Circle, Rocky Top, TN 37769, or to deborah.g.smith@tn.gov. For scheduling contact: Facilities Manager: Chad Young, 865-606-1551, chad.young@tn.gov Facilities Surveyor: Chris Mayeaux, 865-340-3287, chris.mayeaux@tn.gov Prospective respondents must direct communications concerning this ITB to the following person designated as the Solicitation Coordinator: Shane Gibson Department of General Services, CPO 312 Rosa L Parks Avenue, 3rd Floor Tennessee Tower Nashville TN 37243-1102(615) 253-4762 Shane.Gibson@tn.gov Question Deadline 11/22/2023

Post-Bid

Playgrounds / Parks / Athletic Fields

$6,684,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
109
Bidding Soon
957
All Active Projects
405
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.