BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Independence, Missouri. Completed plans call for site work for a water / sewer project.

The City of Independence, Missouri invites bids from qualified Contractors to provide for, but not limited to, all equipment, materials, workmanship, and labor required for the proper removal and reinstallation of a New Kaeser SM 10 T Compressor and Dryer at the Courtney Bend Water Plant for the Water Division of the Municipal Services Department. All questions must be submitted online by close of business on November 20, 2023. Paper, fax, or email bids will NOT be accepted and will not be returned to sender. Pre-bid meeting hosted by Eric Gilkey, Production Maintenance Supervisor. This shall be the only opportunity for bidders to make pre-bid site visits to prepare for this project's bid. Arrangements for individual bidder site visits will not be available for this project. Scope of Work 1.1. The City of Independence, Missouri invites bids from firms to perform the following scope of work at the Courtney Bend Water Plant for the Water Department. The Contract for this project shall provide for, but not limited to, all equipment, materials, workmanship, and labor required for the proper removal and reinstallation of a New Kaeser SM 10 T Compressor and Dryer. The scope of work to be completed by the Contractor for this project shall be categorized for bidding as follows: Line-Item No. 1) Provide for all labor, equipment, materials, and services required and as specified for the complete removal of the Existing Kaeser Compressor and provide for all labor, equipment, materials, and services required and as specified for the Installation of a New Kaeser SM 10 T Compressor and Dryer. Line-Item No. 2) Provide for all labor, equipment, materials, and services required and as specified for the complete removal of the Existing Air Tank and provide for all labor, equipment, materials, and services required and as specified for the Installation of a New Air tank and stand in Filter Valve house # 1. Line-Item No. 3) Provide for all, equipment, materials, and services required and as specified for the Supplying for all, equipment, materials, and services required and as specified for Installation of a New Kaeser SM 10 T Compressor and Dryer. Line-item No. 4) Provide for all, equipment, materials, and services required and as specified for the equipment, materials, and services required and as specified for Supplying of a New Air tank and stand in Filter Valve house # 1. 1.2. Contractor shall perform site remediation to restore all areas affected by execution of the project to its previous condition or better.

Award

Water / Sewer

$55,450.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
0
Bidding Soon
714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2023

December 27, 2023

Project location map

Multiple Locations, Independence, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.